Skip to main content
Glama
omnioperand-mcp

omnioperand-mcp

omni_transformer_kva_rating

Calculate transformer kVA rating, primary/secondary full-load current, and recommended standard size from load amps, voltages, and growth margin for single- or three-phase distribution.

Instructions

3-Phase & Single-Phase Transformer kVA Rating Calculator. Calculate full-load secondary current (FLA), primary current, and recommended standard transformer kVA size for commercial and industrial electrical distribution. Discipline: ENERGY. Governing mathematical model / formula: 3-Phase kVA = (√3 × Volts_LL × Amps) / 1000 | FLA = (kVA × 1000) / (√3 × Volts_LL).

USAGE GUIDELINES:

  • WHEN TO USE: Invoke for deterministic calculation of recommended_kva (Standard Transformer Rating), calculated_kva (Exact Design Load kVA), secondary_fla (Full Load Secondary Amps (FLA)), primary_fla (Full Load Primary Amps (FLA)) using load_amps (Full Load Current (Amperes) in Amps), secondary_voltage (Secondary Voltage (Volts L-L) in V), primary_voltage (Primary Utility Voltage (Volts L-L) in V), is_three_phase (Phase Configuration (3 = 3-Phase, 1 = 1-Phase)), growth_margin_pct (Future Spare Capacity Margin (%) in %). Guarantees exact machine floating-point precision, eliminating LLM arithmetic mistakes and formula hallucinations.

  • WHEN NOT TO USE: Do not use for qualitative evaluations or unquantified reasoning. All input parameters must be valid numerical values.

DISAMBIGUATION & BOUNDARIES:

  • Use this dedicated specialist tool for '3-Phase & Single-Phase Transformer kVA Rating Calculator' rather than generic dispatchers like omni_universal_query.

  • For multi-calculation chained jobs, use 'omni_batch_calculate'.

  • To inspect schema fields, see 'omni_describe_solver'.

BEHAVIOR & SAFETY:

  • Pure deterministic computation with machine floating-point precision.

  • Read-only, idempotent, and stateless. Zero side effects or persistent state mutations.

  • Input validation: All arguments are validated against physical and domain bounds. Out-of-bounds inputs return a safe diagnostic error status without throwing runtime exceptions.

RETURNS:

  • Structured JSON object containing:

    • status (string): "success" on valid execution or "error" if validation fails

    • calculator (string): "transformer-kva-rating"

    • category (string): "energy"

    • name (string): "3-Phase & Single-Phase Transformer kVA Rating Calculator"

    • formula (string): Governing mathematical formula string

    • inputs (object): Echoed input parameter dictionary with applied defaults

    • metrics (object): Dictionary of computed outputs:

      • metrics.recommended_kva (Standard Transformer Rating): Formatted display string (e.g. '75 kVA')

      • metrics.calculated_kva (Exact Design Load kVA): Formatted display string (e.g. '81.0 kVA')

      • metrics.secondary_fla (Full Load Secondary Amps (FLA)): Formatted display string (e.g. '208.2 Amps')

      • metrics.primary_fla (Full Load Primary Amps (FLA)): Formatted display string (e.g. '90.2 Amps')

    • execution_time_ms (number): Latency in milliseconds.

Tool call template

This tool declares no required parameters. Add optional parameters from the input schema as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {},
    "name": "omni_transformer_kva_rating"
  }
}

Input Schema

NameRequiredDescriptionDefault
load_ampsNoFull Load Current (Amperes) (Amps). Calculated total electrical load in amperes. Default: 180. Min: 10. Max: 4000.
is_three_phaseNoPhase Configuration (3 = 3-Phase, 1 = 1-Phase). 3 for three-phase, 1 for single-phase. Default: 3. Min: 1. Max: 3.
primary_voltageNoPrimary Utility Voltage (Volts L-L) (V). Supply feeding the transformer. Default: 480. Min: 240. Max: 13800.
growth_margin_pctNoFuture Spare Capacity Margin (%) (%). Recommended 20% to 25% NEC spare capacity. Default: 25. Min: 0. Max: 50.
secondary_voltageNoSecondary Voltage (Volts L-L) (V). Common voltages: 208V, 240V, 480V. Default: 208. Min: 120. Max: 600.

Schema Changelog

Changes observed during successful MCP inspections.

  1. Addedv0.1.2

TDQS

Score is being calculated.

Deploy Server

Other Tools