Skip to main content
Glama
omnioperand-mcp

omnioperand-mcp

omni_earthwork_cut_and_fill

Calculate earthwork cut and fill volumes in cubic yards between station cross-sections using the Average End Area Method; includes compacted fill and tri-axle truckload estimates.

Instructions

Earthwork Cut and Fill Volume Calculator (Average End Area Method). Calculate earthwork excavation cut and fill volumes in cubic yards between station cross-sections using the standard civil Average End Area Method. Discipline: ENGINEERING. Governing mathematical model / formula: Volume (Cu Yds) = [(Area₁ + Area₂) / 2] × (Station Distance L in Feet) / 27.

USAGE GUIDELINES:

  • WHEN TO USE: Invoke for deterministic calculation of cut_volume_cubic_yards (Total Cut Volume (In-Situ Bank)), compacted_fill_equivalent (Compacted Fill Yield), truckloads_triaxle_15cy (Estimated Dump Truck Hauls), average_cut_area_sqft (Mean Cross-Sectional Area) using station_1_cut_area_sqft (Station 1 Cut Cross-Section Area (sq ft) in sq ft), station_2_cut_area_sqft (Station 2 Cut Cross-Section Area (sq ft) in sq ft), station_interval_length_ft (Distance Between Stations (Feet) in ft), soil_shrink_swell_pct (Soil Compaction Shrinkage Factor (%) in %). Guarantees exact machine floating-point precision, eliminating LLM arithmetic mistakes and formula hallucinations.

  • WHEN NOT TO USE: Do not use for qualitative evaluations or unquantified reasoning. All input parameters must be valid numerical values.

DISAMBIGUATION & BOUNDARIES:

  • Use this dedicated specialist tool for 'Earthwork Cut and Fill Volume Calculator (Average End Area Method)' rather than generic dispatchers like omni_universal_query.

  • For multi-calculation chained jobs, use 'omni_batch_calculate'.

  • To inspect schema fields, see 'omni_describe_solver'.

BEHAVIOR & SAFETY:

  • Pure deterministic computation with machine floating-point precision.

  • Read-only, idempotent, and stateless. Zero side effects or persistent state mutations.

  • Input validation: All arguments are validated against physical and domain bounds. Out-of-bounds inputs return a safe diagnostic error status without throwing runtime exceptions.

RETURNS:

  • Structured JSON object containing:

    • status (string): "success" on valid execution or "error" if validation fails

    • calculator (string): "earthwork-cut-and-fill"

    • category (string): "engineering"

    • name (string): "Earthwork Cut and Fill Volume Calculator (Average End Area Method)"

    • formula (string): Governing mathematical formula string

    • inputs (object): Echoed input parameter dictionary with applied defaults

    • metrics (object): Dictionary of computed outputs:

      • metrics.cut_volume_cubic_yards (Total Cut Volume (In-Situ Bank)): Formatted display string (e.g. '1,027.8 Cu Yds')

      • metrics.compacted_fill_equivalent (Compacted Fill Yield): Formatted display string (e.g. '904.4 Cu Yds (After 12% Shrink)')

      • metrics.truckloads_triaxle_15cy (Estimated Dump Truck Hauls): Formatted display string (e.g. '69 Truckloads (15 CY Tri-Axle)')

      • metrics.average_cut_area_sqft (Mean Cross-Sectional Area): Formatted display string (e.g. '277.5 sq ft')

    • execution_time_ms (number): Latency in milliseconds.

Tool call template

This tool declares no required parameters. Add optional parameters from the input schema as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {},
    "name": "omni_earthwork_cut_and_fill"
  }
}

Input Schema

NameRequiredDescriptionDefault
soil_shrink_swell_pctNoSoil Compaction Shrinkage Factor (%) (%). Volume loss when loose excavated cut is compacted into fill. Default: 12. Min: 0. Max: 30.
station_1_cut_area_sqftNoStation 1 Cut Cross-Section Area (sq ft) (sq ft). End area of cut at first station. Default: 245. Min: 0. Max: 10000.
station_2_cut_area_sqftNoStation 2 Cut Cross-Section Area (sq ft) (sq ft). End area of cut at second station. Default: 310. Min: 0. Max: 10000.
station_interval_length_ftNoDistance Between Stations (Feet) (ft). Standard survey station distance = 100 ft (1+00 to 2+00). Default: 100. Min: 10. Max: 500.

Schema Changelog

Changes observed during successful MCP inspections.

  1. Addedv0.1.2

TDQS

Score is being calculated.

Deploy Server

Other Tools