Skip to main content
Glama
omnioperand-mcp

omnioperand-mcp

omni_tenant_improvement

Calculate tenant improvement allowances, build-out costs, and TI amortization to derive effective net rent per square foot and annual cash outflow.

Instructions

Tenant Improvement (TI) Allowance & Amortization Calculator. Calculate Tenant Improvement (TI) build-out costs, landlord allowances per square foot, leasing commissions, and effective net rent. Discipline: FINANCE. Governing mathematical model / formula: TI Amortization = Total TI Allowance × [r(1+r)ⁿ] / [(1+r)ⁿ - 1] | Effective Net Rent = Base Rent - Amortized TI.

USAGE GUIDELINES:

  • WHEN TO USE: Invoke for deterministic calculation of total_ti_cash_outflow (Total Landlord TI Cash Outlay), annualized_ti_amortization (Annualized TI Amortization Drag), ti_cost_psf_annual (Amortized TI Cost per SF), effective_net_rent_psf (Effective Net Rent Realized by Landlord) using leased_square_footage (Leased Premises Area (SF) in SF), ti_allowance_psf (Landlord TI Allowance ($/SF)), lease_term_years (Lease Term Duration (Years) in years), landlord_cost_of_capital (Landlord Cost of Capital / Interest Rate in %), contract_base_rent_psf (Contract Base Rent ($/SF/Yr)). Guarantees exact machine floating-point precision, eliminating LLM arithmetic mistakes and formula hallucinations.

  • WHEN NOT TO USE: Do not use for qualitative evaluations or unquantified reasoning. All input parameters must be valid numerical values.

DISAMBIGUATION & BOUNDARIES:

  • Use this dedicated specialist tool for 'Tenant Improvement (TI) Allowance & Amortization Calculator' rather than generic dispatchers like omni_universal_query.

  • For multi-calculation chained jobs, use 'omni_batch_calculate'.

  • To inspect schema fields, see 'omni_describe_solver'.

BEHAVIOR & SAFETY:

  • Pure deterministic computation with machine floating-point precision.

  • Read-only, idempotent, and stateless. Zero side effects or persistent state mutations.

  • Input validation: All arguments are validated against physical and domain bounds. Out-of-bounds inputs return a safe diagnostic error status without throwing runtime exceptions.

RETURNS:

  • Structured JSON object containing:

    • status (string): "success" on valid execution or "error" if validation fails

    • calculator (string): "tenant-improvement"

    • category (string): "finance"

    • name (string): "Tenant Improvement (TI) Allowance & Amortization Calculator"

    • formula (string): Governing mathematical formula string

    • inputs (object): Echoed input parameter dictionary with applied defaults

    • metrics (object): Dictionary of computed outputs:

      • metrics.total_ti_cash_outflow (Total Landlord TI Cash Outlay): Formatted display string (e.g. '$225,000.00')

      • metrics.annualized_ti_amortization (Annualized TI Amortization Drag): Formatted display string (e.g. '$56,350.00 / yr')

      • metrics.ti_cost_psf_annual (Amortized TI Cost per SF): Formatted display string (e.g. '$11.27 / SF / yr')

      • metrics.effective_net_rent_psf (Effective Net Rent Realized by Landlord): Formatted display string (e.g. '$20.73 / SF / yr')

    • execution_time_ms (number): Latency in milliseconds.

Tool call template

This tool declares no required parameters. Add optional parameters from the input schema as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {},
    "name": "omni_tenant_improvement"
  }
}

Input Schema

NameRequiredDescriptionDefault
lease_term_yearsNoLease Term Duration (Years) (years). Primary lease commitment term. Default: 5. Min: 1. Max: 20.
ti_allowance_psfNoLandlord TI Allowance ($/SF). Cash contributed by landlord toward buildout. Default: 45. Min: 0. Max: 250.
leased_square_footageNoLeased Premises Area (SF) (SF). Rentable square footage. Default: 5000. Min: 500. Max: 250000.
contract_base_rent_psfNoContract Base Rent ($/SF/Yr). Stated annual rent per SF. Default: 32. Min: 10. Max: 150.
landlord_cost_of_capitalNoLandlord Cost of Capital / Interest Rate (%). Cost of financing TI capital. Default: 8. Min: 4. Max: 15.

Schema Changelog

Changes observed during successful MCP inspections.

  1. Addedv0.1.2

TDQS

Score is being calculated.

Deploy Server

Other Tools