omni_detention_pond_settling_volume
Calculate required stormwater detention basin storage volume, footprint, and peak flow attenuation from post- and pre-development runoff peaks and storm duration.
Instructions
Stormwater Detention Basin Storage Volume & Settling Inflow Calculator. Calculate required active flood retention storage volume (acre-feet and cubic feet) and orifice release diameter for post-development stormwater mitigation. Discipline: ENGINEERING. Governing mathematical model / formula: Storage Volume V_s = (Runoff Volume Post - Runoff Volume Pre) | Inflow Hydrograph Routing.
USAGE GUIDELINES:
WHEN TO USE: Invoke for deterministic calculation of required_retention_storage_cuft (Required Active Storage Volume), required_storage_acre_feet (Storage in Acre-Feet), pond_footprint_half_depth (Pond Water Surface Area (@ 4 ft depth)), discharge_reduction_pct (Peak Flow Attenuation) using post_development_peak_cfs (Post-Development Peak Runoff (Q_post in CFS) in CFS), pre_development_target_cfs (Pre-Development Allowable Discharge (Q_pre in CFS) in CFS), storm_duration_hours (Design Storm Duration (Hours) in hours). Guarantees exact machine floating-point precision, eliminating LLM arithmetic mistakes and formula hallucinations.
WHEN NOT TO USE: Do not use for qualitative evaluations or unquantified reasoning. All input parameters must be valid numerical values.
DISAMBIGUATION & BOUNDARIES:
Use this dedicated specialist tool for 'Stormwater Detention Basin Storage Volume & Settling Inflow Calculator' rather than generic dispatchers like omni_universal_query.
For multi-calculation chained jobs, use 'omni_batch_calculate'.
To inspect schema fields, see 'omni_describe_solver'.
BEHAVIOR & SAFETY:
Pure deterministic computation with machine floating-point precision.
Read-only, idempotent, and stateless. Zero side effects or persistent state mutations.
Input validation: All arguments are validated against physical and domain bounds. Out-of-bounds inputs return a safe diagnostic error status without throwing runtime exceptions.
RETURNS:
Structured JSON object containing:
status (string): "success" on valid execution or "error" if validation fails
calculator (string): "detention-pond-settling-volume"
category (string): "engineering"
name (string): "Stormwater Detention Basin Storage Volume & Settling Inflow Calculator"
formula (string): Governing mathematical formula string
inputs (object): Echoed input parameter dictionary with applied defaults
metrics (object): Dictionary of computed outputs:
metrics.required_retention_storage_cuft (Required Active Storage Volume): Formatted display string (e.g. '108,000 cu ft')
metrics.required_storage_acre_feet (Storage in Acre-Feet): Formatted display string (e.g. '2.48 Acre-Feet')
metrics.pond_footprint_half_depth (Pond Water Surface Area (@ 4 ft depth)): Formatted display string (e.g. '27,000 sq ft (0.62 Acres)')
metrics.discharge_reduction_pct (Peak Flow Attenuation): Formatted display string (e.g. '57.1% Flow Reduction')
execution_time_ms (number): Latency in milliseconds.
Tool call template
This tool declares no required parameters. Add optional parameters from the input schema as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {},
"name": "omni_detention_pond_settling_volume"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| storm_duration_hours | No | Design Storm Duration (Hours) (hours). Critical duration for peak storage requirement. Default: 2.5. Min: 1. Max: 24. | |
| post_development_peak_cfs | No | Post-Development Peak Runoff (Q_post in CFS) (CFS). Unmitigated 25-year post-construction peak flow. Default: 42. Min: 5. Max: 500. | |
| pre_development_target_cfs | No | Pre-Development Allowable Discharge (Q_pre in CFS) (CFS). Pre-existing natural pasture/forest peak discharge limit. Default: 18. Min: 2. Max: 250. |