Skip to main content
Glama
omnioperand-mcp

omnioperand-mcp

omni_data_center_pue

Calculate Data Center PUE, DCiE efficiency, overhead cooling power, and annual energy costs from facility and IT loads to eliminate manual arithmetic errors.

Instructions

Data Center Power Usage Effectiveness (PUE) & Efficiency Calculator. Calculate Data Center PUE, Data Center Infrastructure Efficiency (DCiE), wasted facility cooling power, and annual carbon/energy costs. Discipline: ENERGY. Governing mathematical model / formula: PUE = Total Facility Power (kW) / IT Equipment Power (kW) | DCiE = (1 / PUE) × 100.

USAGE GUIDELINES:

  • WHEN TO USE: Invoke for deterministic calculation of calculated_pue (Power Usage Effectiveness (PUE)), dcie_efficiency_pct (Infrastructure Efficiency (DCiE)), overhead_cooling_kw (Overhead Power (Cooling & Losses)), annual_overhead_cost (Annual Non-IT Overhead Energy Cost) using total_facility_kw (Total Facility Power Draw (kW) in kW), it_equipment_kw (Baseline IT Equipment Load (kW) in kW), electricity_rate (Commercial Electricity Price ($/kWh)). Guarantees exact machine floating-point precision, eliminating LLM arithmetic mistakes and formula hallucinations.

  • WHEN NOT TO USE: Do not use for qualitative evaluations or unquantified reasoning. All input parameters must be valid numerical values.

DISAMBIGUATION & BOUNDARIES:

  • Use this dedicated specialist tool for 'Data Center Power Usage Effectiveness (PUE) & Efficiency Calculator' rather than generic dispatchers like omni_universal_query.

  • For multi-calculation chained jobs, use 'omni_batch_calculate'.

  • To inspect schema fields, see 'omni_describe_solver'.

BEHAVIOR & SAFETY:

  • Pure deterministic computation with machine floating-point precision.

  • Read-only, idempotent, and stateless. Zero side effects or persistent state mutations.

  • Input validation: All arguments are validated against physical and domain bounds. Out-of-bounds inputs return a safe diagnostic error status without throwing runtime exceptions.

RETURNS:

  • Structured JSON object containing:

    • status (string): "success" on valid execution or "error" if validation fails

    • calculator (string): "data-center-pue"

    • category (string): "energy"

    • name (string): "Data Center Power Usage Effectiveness (PUE) & Efficiency Calculator"

    • formula (string): Governing mathematical formula string

    • inputs (object): Echoed input parameter dictionary with applied defaults

    • metrics (object): Dictionary of computed outputs:

      • metrics.calculated_pue (Power Usage Effectiveness (PUE)): Formatted display string (e.g. '1.50')

      • metrics.dcie_efficiency_pct (Infrastructure Efficiency (DCiE)): Formatted display string (e.g. '66.7%')

      • metrics.overhead_cooling_kw (Overhead Power (Cooling & Losses)): Formatted display string (e.g. '550 kW')

      • metrics.annual_overhead_cost (Annual Non-IT Overhead Energy Cost): Formatted display string (e.g. '$530,000.00 / yr')

    • execution_time_ms (number): Latency in milliseconds.

Tool call template

This tool declares no required parameters. Add optional parameters from the input schema as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {},
    "name": "omni_data_center_pue"
  }
}

Input Schema

NameRequiredDescriptionDefault
it_equipment_kwNoBaseline IT Equipment Load (kW) (kW). Power consumed directly by servers, storage, and networking. Default: 1100. Min: 40. Max: 80000.
electricity_rateNoCommercial Electricity Price ($/kWh). Data center utility tariff. Default: 0.11. Min: 0.04. Max: 0.4.
total_facility_kwNoTotal Facility Power Draw (kW) (kW). Total utility power entering building (IT + Cooling + Lighting + UPS). Default: 1650. Min: 50. Max: 100000.

Schema Changelog

Changes observed during successful MCP inspections.

  1. Addedv0.1.2

TDQS

Score is being calculated.

Deploy Server

Other Tools