createCostStructureSlide
Create or update a cost structure slide with cost buckets and notes. Define fixed vs variable costs and organize your cost breakdown.
Instructions
Create or update a cost structure with buckets and notes.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"buckets": "<buckets>"
},
"name": "createCostStructureSlide"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| _index | No | If 0 <= _index < slides.length, update that position. Omit or -1/out-of-range to append to the end (default -1). | |
| buckets | Yes | ||
| fixedVsVariable | No |