mcp_opendaw_get_project_duration
Get the total project duration by finding the end position of the last region across all tracks. Returns duration in beats and seconds.
Instructions
Get the total project duration — the end position of the last region across all tracks.
Returns the duration in beats and seconds, or error.
Tool call template
This tool declares no required parameters. Add optional parameters from the input schema as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {},
"name": "mcp_opendaw_get_project_duration"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
No arguments | |||
Output Schema
| Name | Required | Description | Default |
|---|---|---|---|
| result | Yes |