athena_bridge_account
Assess whether a bridge's future routing, reuse, quality, and resilience benefits exceed its build, maintenance, and capacity costs, guiding build decisions.
Instructions
Apply living-bridge cost accounting: build only when future routing/reuse/quality/resilience value exceeds build, maintenance and locked-capacity cost.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"bridge": "<bridge>"
},
"name": "athena_bridge_account"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| bridge | Yes |