Create baseline
rillsoft_baseline_createCreate and select a baseline snapshot of the current project state. Set replaceAll to true to delete existing baselines first before saving the new baseline.
Instructions
Creates a baseline as a snapshot of the current state of the project and selects it. With replaceAll:true the existing baselines are deleted first - that is the destructive part of this tool. Switching between existing baselines goes through rillsoft_baseline_select, and the planned-versus-actual comparison itself through rillsoft_variance_report_get. Refused in a portfolio: there is no baseline there, not even per project. One undo step.
Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| name | No | name of the baseline; defaults to the project name plus a timestamp | |
| replaceAll | No | true = delete the existing baselines first (defaults to false) |
Output Schema
| Name | Required | Description | Default |
|---|---|---|---|
| name | Yes | name of the created baseline | |
| uuid | Yes | UUID of the created baseline | |
| number | Yes | number of the created baseline | |
| selection | Yes | the selected baseline |