Skip to main content
Glama
rillsoft

Rillsoft Project MCP server

Official

Related Servers

Alternatives to Rillsoft Project MCP server

No user-submitted related servers found.

    Related Servers

    • A
      license
      Not graded
      quality
      C
      maintenance
      Enables AI assistants to control, automate, and query desktop project-management schedules in real time via native Windows COM, including task/WBS management, resource and cost assignment, baselines, critical path, status reporting, and PDF export.
      MIT
    • F
      license
      Not graded
      quality
      A
      maintenance
      Enables AI assistants like Claude for Desktop or Cursor to control supported CAD applications through MCP, supporting drawing, layer and entity management, block operations, data export, and file/session control via natural language or unified tool calls.
      -
    • F
      license
      Not graded
      quality
      A
      maintenance
      Enables AI assistants like Claude Desktop or Cursor to control supported CAD applications through MCP tools for drawing, layer, block, entity, data export, and file/session operations using natural language or direct tool calls.
      -
    • A
      license
      Not graded
      quality
      C
      maintenance
      MCP server that enables LLMs to read and analyze Microsoft Project schedules, including critical path, resources, and advanced construction planning layers (AWP and LPS) for work packages and Lean planning.
      MIT
    • A
      license
      Not graded
      quality
      A
      maintenance
      Enables MCP-capable assistants to control an open ArcGIS Pro project locally over TCP 127.0.0.1, with 68 commands and 167 tools for layers, editing, symbology, layouts, geoprocessing, and arcpy execution.
      2
      MIT

    TDQS

    A3.9/5.0

    Scored across 118 tools

    Disambiguation4/5

    Many tools target closely related operations: generic vs specific element deletion/move (rillsoft_element_delete vs rillsoft_task_delete/rillsoft_subproject_delete), multiple assignment setters (role, machine role, employee, machine, material), and several view/display tools. However, the descriptions consistently cross-reference and delimit each other, so an attentive agent can usually tell them apart.

    Naming Consistency5/5

    All tools share a uniform rillsoft_ prefix, snake_case, and a consistent resource_action pattern (e.g., rillsoft_task_create, rillsoft_calendar_update, rillsoft_view_state_apply). There are no mixed conventions or vague verb styles.

    Tool Count1/5

    With 118 tools, the server is far beyond the typical 3-15 range and even beyond the 50+ threshold for extreme mismatch. Many operations could be consolidated (e.g., generic element tools, multiple view-state tools), making the surface unwieldy despite the domain's breadth.

    Completeness5/5

    The tool set covers the full project lifecycle: project/task/subproject CRUD, dependencies, resource pool management, calendars, baselines, documents, portfolios, RIS and file operations, scheduling, and view configuration. No obvious dead ends or missing core operations are apparent.

    Maintenance

    ActivityMaintained
    ResponsivenessNo issues