Field calculations for data center engineering: liquid-cooling loop hydraulics, SOP/MOP/EOP classification, and ANSI/ISA-71.04 corrosion coupon classification. Results are design estimates and screening checks, not acceptance records.

Capabilities

Features and capabilities supported by this server

Protocol revision2025-11-25

CapabilityDetails
tools
{
  "listChanged": false
}
prompts
{
  "listChanged": false
}
resources
{
  "subscribe": false,
  "listChanged": false
}

Tools

Functions exposed to the LLM to take actions

NameDescription
liquid_loop_hydraulicsA

Size a liquid-cooling loop (for example an NVL72 rack or a liquid load bank).

Computes the required coolant flow from heat load and Delta-T (Q = m_dot * cp * dT), the mean velocity in the pipe, and the pressure drop from pipe friction, local loss coefficients (zeta) and quick-disconnect couplings (from published Cv values). coolant: "water" or "pg25" (25 % propylene glycol), or pass your own density, specific heat and viscosity. Flags velocities above the 3.0 m/s field guideline.

classify_procedureA

Classify a data center task as SOP, MOP or EOP and list what the paper is missing.

EOP: a service or person is in danger now; it stops at the first safe state. MOP: the work changes redundancy or switching topology; it needs a Point of No Return, a back-out plan and approval before work. SOP: a repeatable routine that never changes redundancy. A Permit to Work is an administrative gate, not a fourth procedure.

classify_corrosion_couponA

Classify a corrosion coupon result under ANSI/ISA-71.04-2013 (G1/G2/G3/GX).

Normalises the measured film thickness to 30 days (R30 = X * 30 / T), classifies copper and silver separately, and reports the room class as the worse of the two. A copper-only result cannot prove G1. Field blanks are reported but never subtracted.

Prompts

Interactive templates invoked by user choice

NameDescription

No prompts

Resources

Contextual data attached and managed by the client

NameDescription

No resources

TDQS

A4/5.0

Scored across 3 tools

Disambiguation5/5

The three tools address completely different artifacts: a hydraulic sizing calculation, procedure classification (SOP/MOP/EOP), and corrosion coupon classification per ANSI/ISA-71.04. There is no plausible overlap in intent, so an agent cannot reasonably misselect among them.

Naming Consistency4/5

All names use consistent snake_case and are descriptive, but the convention is mixed: classify_procedure and classify_corrosion_coupon follow a verb_noun pattern while liquid_loop_hydraulics is a bare noun phrase. The deviation is minor and the topic words still disambiguate clearly.

Tool Count4/5

Three tools is on the thin side, but each is a substantive, self-contained engineering calculation with real internal logic (pressure drop, R30 normalisation, procedure gap analysis) rather than a thin wrapper. Nothing feels padded or redundant.

Completeness4/5

Each tool fully closes its own loop (inputs, computation, classification output, and caveats like velocity flags and bl-than-G1 warnings), so no dead ends within a task. As a broader data-center facilities surface it is narrow — no airflow/power/electrical or unit-conversion helpers, and no way to carry coupon results across time — but those are scope choices, not broken workflows.

Maintenance