set_sprint_cadence
Configure a product's sprint rhythm by setting sprint length, start weekday, automatic sprint creation, and carry-over of unfinished work; changes apply from the next sprint opened.
Instructions
Set a product's sprint rhythm. "Mon-Sun weekly" is length_days 7 + start_weekday 1; a Wednesday fortnight is 14 + 3. Changing it does not move sprints that already exist — it applies from the next sprint opened. Setting a cadence is also what opts a product into having sprints opened and closed on the schedule.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"product_id": "<product_id>"
},
"name": "set_sprint_cadence"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| enabled | No | Whether the schedule touches this product at all. Default true. | |
| product_id | Yes | The product to configure | |
| auto_create | No | Open the next sprint unattended on the schedule. Default true. | |
| length_days | No | Sprint length in days, 1-90. Default 7. | |
| start_weekday | No | 0 = Sunday through 6 = Saturday. Default 1 (Monday). Only decides the FIRST sprint; later ones follow the previous sprint's end. | |
| carry_over_unfinished | No | Move unfinished work into the next sprint on close. Default true. |