We provide all the information about MCP servers via our MCP API.
curl -X GET 'https://glama.ai/api/mcp/v1/servers/oculairmedia/Letta-MCP-server'
If you have feedback or need assistance with the MCP directory API, please join our Discord server
# Letta MCP Server - Coverage Summary
**Date:** 2025-10-18
**SDK Version:** v0.1.3 (commit: a901dc65)
**Framework:** TurboMCP v2.0.0-rc.3
---
## Quick Status
| Component | Status | Coverage | Notes |
|-----------|--------|----------|-------|
| **SDK Integration** | β
Complete | 91% (79/87) | All critical endpoints ready |
| **Tool Handlers** | π‘ In Progress | 7% (6/87 ops) | Only agent_advanced partial |
| **HTTP Transport** | β Not Started | 0% | Needs TurboMCP port |
| **Testing** | β Not Started | 0% | Awaiting tool completion |
---
## Tool Implementation Status
### β
Partial (1 tool)
```
letta_agent_advanced: 6/22 operations (27%)
ββ β
create_agent
ββ β
get_agent
ββ β
list_agents
ββ β
delete_agent
ββ β
attach_tools
ββ β
detach_tools
ββ β 16 operations pending (update, messages, memory, etc.)
```
### β Not Started (6 tools)
```
letta_file_folder_ops: 0/8 operations (SDK: 8/8 β
100%)
letta_memory_unified: 0/15 operations (SDK: 14/15 β
93%)
letta_tool_manager: 0/13 operations (SDK: ~10/13 β οΈ 77%)
letta_source_manager: 0/15 operations (SDK: 13/15 β
87%)
letta_job_monitor: 0/4 operations (SDK: ~3/4 β οΈ 75%)
letta_mcp_ops: 0/10 operations (SDK: 0/10 β Custom)
```
---
## Implementation Priority
### π΄ **Phase 1: Critical (Week 1)**
**Focus:** Core agent and file operations
1. **letta_file_folder_ops** (8 operations)
- **Effort:** 1 day
- **SDK Ready:** β
Yes (100%)
- **Why Critical:** File management fundamental feature
- **Files to Create:**
- `letta-server/src/tools/file_folder_ops.rs`
2. **Complete letta_agent_advanced** (16 operations remaining)
- **Effort:** 2-3 days
- **SDK Ready:** β
Mostly (14/16 confirmed)
- **Why Critical:** Agent management is core functionality
- **Files to Modify:**
- `letta-server/src/tools/agent_advanced.rs`
**Total Operations:** 24 operations (28% of total)
**Total Time:** 3-4 days
---
### π **Phase 2: Core Features (Week 2)**
**Focus:** Memory and tool management
3. **letta_memory_unified** (15 operations)
- **Effort:** 2 days
- **SDK Ready:** β
Yes (93%)
- **Why Important:** Memory is core to agent functionality
- **Files to Create:**
- `letta-server/src/tools/memory_unified.rs`
4. **letta_tool_manager** (13 operations)
- **Effort:** 2-3 days
- **SDK Ready:** β οΈ Needs verification (77%)
- **Why Important:** Tool management for agent capabilities
- **Files to Create:**
- `letta-server/src/tools/tool_manager.rs`
**Total Operations:** 28 operations (32% of total)
**Total Time:** 4-5 days
---
### π’ **Phase 3: Extended Features (Week 3)**
**Focus:** Sources and jobs
5. **letta_source_manager** (15 operations)
- **Effort:** 2 days
- **SDK Ready:** β
Yes (87%)
- **Why Useful:** Document/data source management
- **Files to Create:**
- `letta-server/src/tools/source_manager.rs`
6. **letta_job_monitor** (4 operations)
- **Effort:** 0.5 days
- **SDK Ready:** β οΈ Needs verification (75%)
- **Why Useful:** Background job tracking
- **Files to Create:**
- `letta-server/src/tools/job_monitor.rs`
**Total Operations:** 19 operations (22% of total)
**Total Time:** 2-3 days
---
### π΅ **Phase 4: Infrastructure (Week 4)**
**Focus:** Production readiness
7. **HTTP Transport**
- **Effort:** 3-4 days
- **Why Critical:** Production deployment requirement
- **Features:**
- Streamable HTTP with SSE
- Session management
- CORS support
- Health endpoints
- **Files to Create:**
- `letta-server/src/transports/http.rs`
8. **Testing & Validation**
- **Effort:** 2-3 days
- **Coverage Target:** 80%+
- **Test Types:**
- Unit tests per operation
- Integration tests with mock Letta
- End-to-end with real Letta instance
- Performance benchmarks
**Total Time:** 5-7 days
---
### βͺ **Phase 5: Advanced (Future)**
**Focus:** MCP-to-MCP operations
9. **letta_mcp_ops** (10 operations)
- **Effort:** 5-7 days
- **SDK Ready:** β No (custom implementation)
- **Why Deferred:** Complex, not essential for core functionality
- **Note:** Can operate without this initially
**Total Operations:** 10 operations (11% of total)
---
## Coverage by Numbers
### Overall Tool Coverage
```
Implemented: 6/87 operations (6.9%)
SDK Ready: 74/87 operations (85%)
Pending: 81/87 operations (93%)
```
### SDK Endpoint Coverage
```
Complete (100%): 15 endpoints (File Sessions, Folders)
Excellent (90%+): 35 endpoints (Memory, Source, Messages)
Good (75-89%): 14 endpoints (Agents)
Unknown (<75%): 15 endpoints (Tools, Jobs)
Not Applicable: 10 endpoints (MCP custom)
```
### Implementation Velocity Targets
```
Week 1 (Phase 1): 24 operations β 30/87 total (34%)
Week 2 (Phase 2): 28 operations β 58/87 total (67%)
Week 3 (Phase 3): 19 operations β 77/87 total (89%)
Week 4 (Phase 4): HTTP Transport + Testing
```
---
## File Structure
```
letta-server/
βββ src/
β βββ main.rs β
Entry point (exists)
β βββ lib.rs β
Server core (exists)
β βββ tools/
β β βββ mod.rs β³ Tool registry (needs update)
β β βββ agent_advanced.rs π‘ Partial (6/22)
β β βββ file_folder_ops.rs β NEW (0/8)
β β βββ memory_unified.rs β NEW (0/15)
β β βββ tool_manager.rs β NEW (0/13)
β β βββ source_manager.rs β NEW (0/15)
β β βββ job_monitor.rs β NEW (0/4)
β β βββ mcp_ops.rs βͺ FUTURE (0/10)
β βββ transports/
β βββ http.rs β NEW (TurboMCP)
βββ Cargo.toml β
Dependencies configured
βββ README.md β³ Needs update
```
---
## Dependencies
### Already Configured β
```toml
[dependencies]
turbomcp = { version = "2.0.0-rc.3", features = ["full"] }
letta = { git = "https://github.com/oculairmedia/letta-rs.git", branch = "add-missing-endpoints" }
tokio = { version = "1.47", features = ["full"] }
serde = { version = "1.0", features = ["derive"] }
serde_json = "1.0"
anyhow = "1.0"
thiserror = "2.0"
tracing = "0.1"
```
### May Need to Add
```toml
axum = "0.7" # For HTTP transport
tower = "0.5" # Middleware for axum
tower-http = "0.5" # CORS, session management
uuid = { version = "1.0", features = ["v4", "serde"] } # Session IDs
```
---
## Success Criteria
### Minimal Viable Product (MVP)
- β
SDK integration complete (91%)
- β³ Core tools implemented (agent, file, memory)
- β³ HTTP transport working
- β³ Basic testing coverage (50%+)
**Timeline:** 2-3 weeks
### Production Ready
- β
SDK integration complete (91%)
- β³ All tools implemented (except MCP ops)
- β³ HTTP transport with sessions
- β³ Comprehensive testing (80%+)
- β³ Performance benchmarks met
- β³ Documentation complete
**Timeline:** 3-4 weeks
### Feature Complete
- β
SDK integration complete (91%)
- β³ All tools implemented (including MCP ops)
- β³ Advanced HTTP features (streaming, SSE)
- β³ 100% test coverage
- β³ Performance optimizations
- β³ Production deployment guide
**Timeline:** 5-6 weeks
---
## Key Metrics
### Performance Targets
```
Startup Time: < 500ms (Node.js: ~2s)
Memory (Idle): < 50MB (Node.js: ~80MB)
Request Latency: -30% vs Node.js
Throughput: 100 concurrent requests
```
### Quality Targets
```
Test Coverage: 80%+
Clippy Warnings: 0
Documentation: All public APIs
Type Safety: 100% (no unsafe, no unwrap in prod)
```
---
## Next Steps
1. **Today:** Implement `letta_file_folder_ops` (8 operations)
2. **This Week:** Complete `letta_agent_advanced` (16 operations)
3. **Next Week:** Implement `letta_memory_unified` and `letta_tool_manager`
4. **Week 3:** Complete remaining tools and HTTP transport
5. **Week 4:** Testing, documentation, deployment
**See IMPLEMENTATION_ROADMAP.md for detailed plan**