Skip to main content
Glama
Jira MCP Server

Jira MCP Server

by wince87

jira_update_sprint

DestructiveIdempotent

Update sprint details by renaming it, setting its goal or dates, or changing state (future, active, closed). Starting requires start/end dates; closing moves unfinished issues to backlog.

Instructions

Update a sprint: rename it, set the goal or dates, or move it through the workflow with state ("future" -> "active" -> "closed"). Starting a sprint requires startDate and endDate to be set. Closing a sprint moves unfinished issues to the backlog in Jira, so confirm before setting state to "closed".

Tool call template

Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {
      "sprintId": "<sprintId>"
    },
    "name": "jira_update_sprint"
  }
}

Input Schema

NameRequiredDescriptionDefault
goalNoNew sprint goal
nameNoNew sprint name
stateNoSprint state
endDateNoISO 8601 with timezone
sprintIdYesSprint ID (use jira_list_sprints)
startDateNoISO 8601 with timezone

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observedv3.0.2

TDQS

A4.3/5.0
Behavior5/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

Annotations only flag destructiveHint/openWorldHint abstractly; the description converts that into the concrete consequence that closing a sprint pushes unfinished issues to the backlog and therefore warrants confirmation. Combined with the state-transition order and the date prerequisite, this is behavior an agent cannot infer from the structured fields.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness5/5

Is the description appropriately sized, front-loaded, and free of redundancy?

Three sentences, front-loaded with the scope, then prerequisites, then the destructive side effect. Each sentence carries distinct information with no repetition of the title or schema.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness4/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

For a six-parameter mutation with no output schema, the description covers scope, prerequisites, and the main destructive consequence. It is silent on return content and on whether omitted fields are left untouched, which for an idempotent partial update would be worth one more clause.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters4/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema coverage is 100%, so the baseline is 3, and the description adds genuine meaning on top: the allowed state ordering and the conditional requirement linking startDate/endDate to the 'active' transition. It does not clarify date format or partial-update semantics, which keeps it from a 5.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose4/5

Does the description clearly state what the tool does and how it differs from similar tools?

States a specific verb and resource plus the exact editable fields (name, goal, dates, state) and the workflow axis (future -> active -> closed). It is clearly a mutation of one sprint, distinguishable from create/delete/get siblings by the verb, though it never names an alternative explicitly.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines4/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

Gives real preconditions: starting requires startDate and endDate, and closing should be confirmed first. It does not say when to prefer this tool over e.g. moving issues to a sprint, but the context it supplies is well beyond boilerplate.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.

Deploy Server

Other Tools