Skip to main content
Glama
Jira MCP Server

Jira MCP Server

by wince87

jira_rank_issues

Idempotent

Reorder Jira backlog or board issues by placing them before or after a reference issue to control sprint-planning priority order.

Instructions

Reorder issues in the backlog or on a board by placing them before or after a reference issue. This is what changes the order sprint planning reads as priority.

Tool call template

Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {
      "issueKeys": "<issueKeys>"
    },
    "name": "jira_rank_issues"
  }
}

Input Schema

NameRequiredDescriptionDefault
issueKeysYesIssues to move (max 50), kept in the given order
rankAfterIssueNoPlace them immediately below this issue
rankBeforeIssueNoPlace them immediately above this issue

Output Schema

NameRequiredDescriptionDefault
urlNo
messageNo
successYes

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observedv3.0.2

TDQS

A3.5/5.0
Behavior3/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

Annotations already declare non-read-only, idempotent, non-destructive, open-world behavior, so the safety profile is covered. The description adds real value by explaining the downstream effect (this ordering is what sprint planning reads), but it does not disclose what happens to non-listed issues, behavior when both reference parameters are given, or how failures on invalid keys are surfaced. The phrase "reads as priority" also risks conflating rank order with Jira's separate priority field.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness4/5

Is the description appropriately sized, front-loaded, and free of redundancy?

Two short sentences with the operation front-loaded and no filler. The second sentence is slightly colloquial ("reads as priority") and could be sharper, but it is not padding.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness4/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

The tool is simple: three well-documented parameters, an output schema present, and full schema description coverage, so the description does not need to explain returns. What remains missing is the before/after mutual-exclusivity rule and error/precondition behavior for invalid reference issues.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters3/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema coverage is 100%, so parameter documentation is already complete, and this establishes the baseline. The description only restates the before/after placement idea already present in the rankBeforeIssue/rankAfterIssue descriptions ("immediately below"/"immediately above") and adds no new semantics such as mutual exclusivity or the max-50 ordering constraint.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose4/5

Does the description clearly state what the tool does and how it differs from similar tools?

States a specific verb and resource ("Reorder issues in the backlog or on a board") plus the mechanism ("placing them before or after a reference issue"), so an agent knows exactly what operation this performs. No sibling in the list performs ranking, so the lack of explicit sibling contrast costs little.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines3/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

The description scopes usage to backlog/board ordering and implies a reference issue is required, which is useful context. However, it gives no explicit when-to-use vs. when-not, does not say that exactly one of rankBeforeIssue/rankAfterIssue should be supplied, and does not contrast with bulk-update or transition tools that also touch issues.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.

Deploy Server

Other Tools