Skip to main content
Glama
Jira MCP Server

Jira MCP Server

by wince87

jira_list_epics

Read-onlyIdempotent

List all epics in a Jira project via JQL, filter them by status, paginate results, and optionally include custom field details.

Instructions

List all epics in a project via JQL (issuetype = Epic).

Tool call template

This tool declares no required parameters. Add optional parameters from the input schema as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {},
    "name": "jira_list_epics"
  }
}

Input Schema

NameRequiredDescriptionDefault
fieldsNoExact field IDs to return per epic, e.g. ["summary", "customfield_10122"] or ["*all"]. When set, each item returns a raw fields map instead of the default shape.
statusNoFilter by status name (e.g., "In Progress", "Done")
maxResultsNoMaximum results (1-100)
projectKeyNoProject key (defaults to JIRA_PROJECT_KEY)
nextPageTokenNoPagination token from previous response
includeCustomFieldsNoAdd a customFields map (id -> { name, type, value }) to every epic. Rich-text fields render as Markdown.

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observedv3.0.2

TDQS

B3.2/5.0
Behavior3/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

Annotations already declare readOnlyHint, idempotentHint, destructiveHint=false and openWorldHint, so safety is covered. The description adds one useful behavioral fact, that the underlying query is issuetype = Epic, clarifying that only epics are returned and that results are JQL-derived. It does not mention pagination behavior or how results are shaped by default, though much of that is in the schema.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness4/5

Is the description appropriately sized, front-loaded, and free of redundancy?

A single front-loaded sentence with no filler; the verb, resource, scope, and query basis are all in the first few words. It is efficient, though its brevity borders on under-specification rather than ideal density.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness3/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

With six optional parameters and no output schema, the schema covers inputs well, but the description does not explain the default result shape versus the raw fields mode, nor the default project behavior (JIRA_PROJECT_KEY). These are inferable from the schema but not reinforced, leaving the definition adequate rather than complete.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters3/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema description coverage is 100%, so every parameter (fields, status, maxResults, projectKey, nextPageToken, includeCustomFields) is already documented with examples and defaults. The description adds no parameter-level meaning beyond the schema, which is the expected baseline when the schema does the work.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose4/5

Does the description clearly state what the tool does and how it differs from similar tools?

The description states a specific verb and resource ('List all epics') plus the underlying mechanism ('via JQL (issuetype = Epic)'), so an agent knows exactly what is retrieved. It scopes results to a project, but does not name or contrast with the sibling jira_get_board_epics, leaving the agent to guess which epic-listing tool applies.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines2/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

There is no when-to-use or when-not-to-use guidance. Given a sibling named jira_get_board_epics, the definition should say whether this tool is the project-wide JQL alternative or when the board-scoped one is preferred, but it says nothing about alternatives or preconditions.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.

Deploy Server

Other Tools