Skip to main content
Glama
sharafutdinovdi

Revit Model MCP

Copy Elements

revit_copy
Destructive

Create up to 100 successive Revit element copies at model-axis offsets in mm. Preview skipped group members with dry_run before applying changes.

Instructions

Create 1 to 100 successive copies at multiples of the model-axis offset in mm. Members of groups that Revit refuses to change are reported in skipped.inGroup and skipped; dry_run predicts this, and the call is refused if every element is such a member.

Input Schema

TableJSON Schema
NameRequiredDescriptionDefault
countNo
dx_mmYes
dy_mmYes
dz_mmNo
dry_runNo
documentNoCase-insensitive substring of the target open document's title or file name. Required to disambiguate when the Revit process has more than one document open; omit only when a single document is open (the active document is used). An unknown or ambiguous reference is rejected before any change.
element_idsYes

Output Schema

TableJSON Schema
NameRequiredDescriptionDefault

No arguments

Schema Changelog

Changes observed during successful MCP inspections.

  1. Addedv0.9.1

TDQS

A3.7/5.0
Behavior4/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

Annotations already declare the mutation profile (destructiveHint=true, readOnlyHint=false, non-idempotent), so the bar is lower, yet the description still adds real value: skipped group members are reported via skipped.inGroup and skipped, dry_run predicts that outcome, and the whole call is refused if every element is such a member. It stops short of explaining why those elements are destructive or how copies interact with existing elements.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness4/5

Is the description appropriately sized, front-loaded, and free of redundancy?

Two sentences, front-loaded with the core action and bounded count, then the failure/reporting behavior. Dense internal jargon (skipped.inGroup) but nothing is padding; every clause conveys a distinct fact.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness4/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

An output schema exists, so return-value explanation is not required, yet the description still covers the key failure path (group members skipped, call refused when all are skipped) for what is a destructive mutation tool. It would be complete at a 5 if it addressed the document/selection prerequisites and the element_ids scope.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters3/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema description coverage is only 14% (just the document parameter), so the description has to compensate. It does clarify count (1 to 100), the dx/dy/dz offset semantics in mm, and dry_run's predictive behavior, but element_ids is never mentioned and the direction/axis meaning of dx_mm, dy_mm, dz_mm (default 0) is only partially conveyed.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose4/5

Does the description clearly state what the tool does and how it differs from similar tools?

States a specific verb and resource ("Create 1 to 100 successive copies") plus the geometric basis (multiples of the model-axis offset in mm), so an agent can tell it apart from geometry siblings like revit_move, revit_mirror, and revit_rotate. It does not explicitly contrast itself with those siblings, keeping it below a 5.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines3/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

Usage is only implied: mentioning that "dry_run predicts this" hints at a preview-then-commit workflow, and the refusal condition tells the agent when a call will fail. There is no explicit statement of when to choose copy over move/mirror/rotate, or of prerequisites (open document, editable elements).

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.

Deploy Server

Other Tools