index_cycle
Calculate indexing conveyor cycle, move, and dwell times per station from target throughput, index distance, speed, and acceleration/deceleration to size conveyor timing.
Instructions
Indexing conveyor: cycle time, move time and dwell available per station.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"target_parts_per_hour": "<target_parts_per_hour>",
"index_distance_ft": "<index_distance_ft>",
"index_speed_fpm": "<index_speed_fpm>",
"accel_decel_s": "<accel_decel_s>"
},
"name": "index_cycle"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| accel_decel_s | Yes | ||
| index_speed_fpm | Yes | ||
| parts_per_index | No | ||
| index_distance_ft | Yes | ||
| target_parts_per_hour | Yes |
Output Schema
| Name | Required | Description | Default |
|---|---|---|---|
| feasible | Yes | ||
| warnings | No | ||
| assumptions | No | ||
| move_time_s | Yes | ||
| cycle_time_s | Yes | ||
| dwell_time_s | Yes | ||
| move_fraction | Yes | ||
| parts_per_index | Yes | ||
| target_parts_per_hour | Yes |