Skip to main content
Glama
log-wade

datacenter-mcp-server

by log-wade

Related Servers

Alternatives to datacenter-mcp-server

No user-submitted related servers found.

    Related Servers

    • F
      license
      Not graded
      quality
      C
      maintenance
      Provides deterministic, standards-based calculations for data center critical power infrastructure. Enables site selection, generator sizing, UPS sizing, NFPA 110 compliance, and more via 50+ AI agents and 8 compound chains.
      -
    • A
      license
      A
      quality
      B
      maintenance
      Deterministic AI data-center design tools for sizing, validation, and conceptual rack/site layouts. Supports NVIDIA Hopper, Blackwell, and Rubin profiles. Calculations require a registered AIDC API key; results preserve warnings, RFIs, and pending validations.
      3
      3
      MIT
    • A
      license
      C
      quality
      C
      maintenance
      27 deterministic engineering compliance and calculation tools for the built environment (data-centre PUE and EED, EPBD, NIS2, Eurocode, UAE compliance), callable by AI agents via MCP and REST API. Free tier; every result cites the governing standard.
      27
      MIT
    • A
      license
      Not graded
      quality
      B
      maintenance
      A physics engine for liquid-cooled GPU systems, exposed as an AI-callable MCP server. Enables thermal analysis, coolant comparison, flow optimization, and rack-level sizing via natural language queries.
      1
      MIT
    • A
      license
      A
      quality
      D
      maintenance
      Enables AI agents to perform unit-aware engineering calculations with automatic unit conversion, dependency resolution, and access to 500+ units across 75+ categories through the CalcsLive calculation engine.
      3
      3 npm
      MIT

    TDQS

    A4/5.0

    Scored across 8 tools

    Disambiguation5/5

    Each tool addresses a distinct data center engineering concern—cooling, power redundancy, tier assessment, commissioning, rack density, GPU cooling, UPS sizing, and reference lookup. There is no semantic overlap that would cause an agent to select the wrong tool.

    Naming Consistency2/5

    Most tools follow a verb_noun pattern (dc_calculate_cooling_load, dc_analyze_power_redundancy, dc_generate_commissioning_plan), but three deviate: dc_gpu_cooling_optimizer, dc_ups_battery_sizing, and dc_reference_lookup use noun-based phrasing. This mixed convention undermines predictability.

    Tool Count5/5

    Eight tools is a well-scoped count for a data center engineering server. Each tool adds meaningful capability, and the set is neither bloated nor too sparse.

    Completeness4/5

    The server covers core design and analysis tasks including cooling, power, redundancy, tier classification, commissioning, and GPU-specific cooling. Minor gaps exist (e.g., no energy cost or physical security tools), but the domain is well covered.

    Maintenance

    ActivityStale
    ResponsivenessNo issues