Data Center Auditor MCP Server
This MCP server provides deterministic data-center engineering calculations, commissioning audits, standards lookups, and defect/corrosion classifications.
Calculate required coolant flow, mass balance, heat removal, and ASHRAE liquid cooling class for AI racks.
Calculate Darcy-Weisbach pipe friction loss, velocity, Reynolds number, and erosion risk.
Audit MOP/SOP/EOP/IST L1-L5 commissioning scripts against physical boundaries, PONR rules, and safety gates.
Classify copper/silver atmospheric corrosion severity per ANSI/ISA-71.04-2013.
Search Data Center Field Guides protocols for formulas, thresholds, and fatal-flaw criteria.
Look up commissioning defect codes and fatal flaws.
Provides deterministic engineering calculations and validation for NVIDIA GB200 NVL72 high-density liquid-cooled AI racks, including coolant flow requirements, heat removal capacity, pipe friction loss, ASHRAE liquid cooling class, and related commissioning audit checks.
Click on "Deploy Server".
Wait a few minutes for the server to deploy. Once ready, it will show a "Started" state.
In the chat, type
@followed by the MCP server name and your instructions, e.g., "@Data Center Auditor MCP Server Calculate coolant flow and ASHRAE class for a 132 kW GB200 rack at 12 K delta T."
That's it! The server will respond to your query, and you can continue using it as needed.
Here is a step-by-step guide with screenshots.
Data Center Auditor MCP Server
A deterministic Model Context Protocol (MCP) server for mission-critical AI data centers, high-density direct-to-chip liquid cooling (NVIDIA GB200 NVL72), and Level 1–5 commissioning TDD protocols.
Powered by the first-principles engineering protocols from Data Center Field Guides by Tristan Howard.
⚠️ Engineering Safety & Liability Disclaimer
IMPORTANT: The calculation formulas, defect code lookups, and commissioning audit tools provided in this server are for first-principles theoretical modeling, educational reference, and design review assistance only.
Fluid hydraulic dynamics, electrical switching (NFPA 70E), and hydrostatic pressure envelopes (ASME B31.3) in mission-critical hyperscale facilities carry severe life-safety, arc-flash, and equipment-damage risks. Output from this tool does not substitute for stamped submittals and peer-reviewed design calculations produced by a licensed Professional Engineer (PE) or manufacturer-certified equipment specifications.
Related MCP server: Corrosion Engineering MCP Server
🛠 Features & Available Tools
This MCP server equips AI agents with 6 deterministic engineering calculation and validation tools:
Tool | Category | Description | Governing Standard |
| Thermal / Fluid | Calculates required liquid coolant flow rate ($L/min$, $GPM$), mass balance, heat removal capacity, and ASHRAE liquid cooling class ($W1$–$W4$) for 132 kW NVL72 racks. | ASHRAE TC 9.9 / NVIDIA GB200 NVL72 |
| Fluid Hydraulics | Calculates Darcy-Weisbach pressure drop ($\Delta P$), pipe fluid velocity, Reynolds number ($Re$), and erosion risk thresholds ($<0.5\text{ m/s}$ settling, $>2.0\text{ m/s}$ erosion) across DN25–DN100 pipes. | Darcy-Weisbach / Swamee-Jain / ASME B31.3 |
| TDD Commissioning | Audits MOP, SOP, EOP, and IST Level 1–5 commissioning scripts against physical boundaries, Point of No Return (PONR) rules, and safety gates. | ASHRAE Guideline 0 / NFPA 70E / Uptime |
| Environmental | Classifies whitespace atmospheric corrosion severity for Copper and Silver reactivity rates according to ANSI/ISA-71.04-2013 ($G1$, $G2$, $G3$, $GX$). | ANSI/ISA-71.04-2013 / RoHS |
| Standard Index | Structured lookup for physical boundary formulas, fatal flaw criteria, and engineering thresholds across the 69 Data Center Field Guide protocols. | DCFG Field Handbook |
| Audit Codes | Fast lookup for fatal commissioning flaws and defect codes (e.g. | DCFG Defect Taxonomy |
🚀 Quick Start & Installation
Option 1: Manual Configuration for Claude Desktop
Add the following to your claude_desktop_config.json (on macOS: ~/Library/Application Support/Claude/claude_desktop_config.json):
{
"mcpServers": {
"datacenter-auditor": {
"command": "node",
"args": ["/PATH/TO/datacenter-mcp/index.js"]
}
}
}Option 2: Manual Configuration for Cursor
Create or edit .cursor/mcp.json in your project root:
{
"mcpServers": {
"datacenter-auditor": {
"command": "node",
"args": ["/PATH/TO/datacenter-mcp/index.js"]
}
}
}📐 Governing Physics & Mathematical Formulations
1. Thermal Heat Balance
$$\dot{Q} = \dot{m} \cdot c_p \cdot \Delta T$$ Where $\dot{Q}$ is rack heat dissipation ($132\text{ kW}$ for NVL72), $\dot{m}$ is coolant mass flow, $c_p$ is fluid specific heat ($3.96\text{ kJ/kg}\cdot\text{K}$ for PG25), and $\Delta T$ is cold plate temperature delta ($10\text{ K}$–$15\text{ K}$).
2. Darcy-Weisbach Pressure Drop
$$\Delta P = f \cdot \frac{L}{D} \cdot \frac{\rho v^2}{2}$$ Friction factor $f$ calculated via the Swamee-Jain explicit approximation of the Colebrook-White equation for turbulent pipe flow ($Re \ge 2,300$): $$f = \frac{0.25}{\left[\log_{10}\left(\frac{\varepsilon}{3.7D} + \frac{5.74}{Re^{0.9}}\right)\right]^2}$$
3. Atmospheric Reactivity Monitoring
Evaluation according to ANSI/ISA-71.04-2013 Table 1 for 30-day passive coupon exposure:
Level G1 (Mild): $\text{Cu} < 300\text{ \AA/30d}$, $\text{Ag} < 200\text{ \AA/30d}$ (Mandatory for RoHS compliance).
Level G2 (Moderate): $\text{Cu} < 1000\text{ \AA/30d}$, $\text{Ag} < 1000\text{ \AA/30d}$.
Level G3 (Harsh): $\text{Cu} < 2000\text{ \AA/30d}$, $\text{Ag} < 2000\text{ \AA/30d}$.
Level GX (Severe): $\text{Cu} \ge 2000\text{ \AA/30d}$, $\text{Ag} \ge 2000\text{ \AA/30d}$.
📚 References & Comprehensive Specifications
The complete 74-protocol engineering library, case studies, and 9-Volume field guide series are available at:
Official Website: https://datacenterfieldguides.com/
9-Volume Book Series: https://datacenterfieldguides.com/buy · Amazon Author Central
Author Profile: Tristan Howard — Principal Data Center Systems Engineer & CxA
AI Specification & LLM Grounding:
SKILL.md·llms.txt·llms-full.txtCore Governing Field Protocols:
SOP vs. MOP vs. EOP Meaning & Full Form: Data Center RACI Matrix and Field Authorization
SOP, MOP, and EOP Are Three Papers: Data Center Switching & Emergency Governance
MOP Point of No Return (PONR): LOTO Isolation, Switching Scripts & Rollback Timing
An EOP Stops at the First Safe State: Emergency Operating Procedure Boundaries
NVIDIA GB200 NVL72 Liquid Cooling EOP: 5-Second Loss-of-Flow Ride-Through
NVL72 Liquid Load Bank Testing: P&ID Hydraulics, Quick Disconnects & Boundary Acceptance
Data Center Commissioning Levels 1 to 5 (L0–L6): 5 Levels of Commissioning, L2 Testing & IST
Data Center CFD Verification Guide: Airflow Modeling vs. Physical Whitespace Measurements
Carbon Media & Corrosion Coupon Analysis: ANSI/ISA-71.04-2013 Severity Rates & RoHS G1 Protection
Facility Location Due Diligence Checklist: Data Center Site Selection & Property Audit
Data Center Technical Due Diligence Checklist: Infrastructure Asset & Engineering Audit
A Handover Signature Is a Sentence: Commissioning L4/L5 Custody Transfer Refusal Gates
Witnessed Is Not the Same as Accepted a Document: Field Commissioning Verification
📄 License
MIT © Tristan Howard (Data Center Field Guides)
Available Tools
6 toolsaudit_commissioning_scriptC
Audits a data center commissioning script (MOP, SOP, EOP, or IST Level 1-5) against deterministic physical boundary rules and safety gates.
Inputs: script_text (required), commissioning_level.
calculate_pipe_friction_lossA
Calculates Darcy-Weisbach pipe friction pressure drop, flow velocity, Reynolds number, and erosion thresholds for data center liquid cooling loops.
Inputs: pipe_dn (required), flow_lpm (required), pipe_length_m (required), coolant_type.
classify_corrosion_severityA
Classifies data center whitespace atmospheric corrosion severity according to ANSI/ISA-71.04-2013 for Copper and Silver reactivity.
Inputs: copper_angstroms_30d (required), silver_angstroms_30d (required).
lookup_defect_codeA
Looks up fatal commissioning flaws and defect codes (e.g. A-01, B-02, C-03) from the Data Center Field Guides audit standard.
Inputs: defect_code (required).
search_field_protocolsA
Searches the Data Center Field Guides ground-truth corpus for commissioning procedures, fatal flaw criteria, and engineering formulas.
Inputs: query (required).
verify_hydraulic_boundaryB
Calculates required coolant flow rate, mass balance, heat removal capacity, and ASHRAE Liquid Cooling Class compliance for AI compute racks (e.g., NVIDIA GB200 NVL72).
Inputs: delta_t_c (required), heat_load_kw (required), coolant_type, supply_temp_c, +1 more.
Tool Schema Changelog
Recent tool additions, removals, and schema changes observed during successful MCP inspections.
Loading tool schema changelog…
TDQS
Scored across 6 tools
Most tools target clearly distinct actions and artifacts, such as auditing a script, searching field protocols, classifying corrosion, or looking up a defect code. The only potential overlap is between verify_hydraulic_boundary and calculate_pipe_friction_loss, since both perform hydraulic calculations, though their descriptions distinguish system-level rack verification from pipe-level friction loss.
All six tool names follow a consistent snake_case verb_noun pattern: audit_, verify_, calculate_, search_, classify_, and lookup_. The verbs are specific and the naming convention is predictable throughout.
Six tools is well-scoped for a focused data center auditing server. Each tool maps to a distinct audit or engineering sub-task, and there is no evident padding or redundancy.
The surface covers the core auditing workflow: script audit, hydraulic verification, friction calculations, protocol search, corrosion classification, and defect lookup. Minor gaps exist around report generation/export or batch auditing, but the main lifecycle needs are represented.
Maintenance
Related MCP Connectors
AI-callable calculators and engineering models with real formulas. No hallucinated math.
Paid deterministic data-quality and execution-verification tools for AI agents.
Protocol-native energy infrastructure orchestration for AI data centers. Provides 46 MCP tools across 8 grid protocols (IEC-61850, DNP3, Modbus, OCPP, OpenADR, IEEE 2030.5, IEC 60870-5-104, ICCP) with 5 core API primitives: connect, dispatch, settle, comply, and intel. Enables AI agents to programmatically interact with substations, grid interfaces, and energy assets for real-time workload-grid coordination.
Deterministic reasoning stack for AI agents: simulate, decide & compute, plus cross-domain tools.
Related MCP Servers
- AlicenseAqualityDmaintenanceEnables AI agents to perform unit-aware engineering calculations with automatic unit conversion, dependency resolution, and access to 500+ units across 75+ categories through the CalcsLive calculation engine.314 npmMIT
- AlicenseNot gradedqualityBmaintenanceProvides AI agents with physics-based corrosion engineering calculations, from rapid handbook lookups to mechanistic electrochemical models with dual-tier pitting assessment for material compatibility screening and corrosion rate prediction.1MIT
- AlicenseAqualityDmaintenanceProvides professional-grade data center engineering calculations including cooling, power, GPU thermal optimization, UPS/battery sizing, tier classification, and commissioning workflows, compliant with ASHRAE and Uptime Institute standards.8161 npm1MIT

security-orchestraofficial
FlicenseNot gradedqualityCmaintenanceProvides deterministic, standards-based calculations for data center critical power infrastructure. Enables site selection, generator sizing, UPS sizing, NFPA 110 compliance, and more via 50+ AI agents and 8 compound chains.-