audit_commissioning_script
Audits data center commissioning scripts (MOP, SOP, EOP, IST L1-L5) against deterministic physical boundary rules and safety gates to identify compliance and safety issues.
Instructions
Audits a data center commissioning script (MOP, SOP, EOP, or IST Level 1-5) against deterministic physical boundary rules and safety gates.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"script_text": "<script_text>"
},
"name": "audit_commissioning_script"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| script_text | Yes | The raw text of the MOP, SOP, EOP or commissioning script to audit | |
| commissioning_level | No | Commissioning level being executed (L1 Factory, L2 Quality/Receipt, L3 Component/PFT, L4 System/FPT, L5 Integrated IST) | ALL |