update_stage
Update specific fields of an existing stage in a HacknPlan project by providing only the changed values.
Instructions
Partially update a stage (PATCH — only provided fields are changed)
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"projectId": "<projectId>",
"stageId": "<stageId>"
},
"name": "update_stage"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| name | No | ||
| stageId | Yes | ||
| projectId | Yes | ||
| description | No |