create_risk
Logs a new risk in a project with required status, type, probability, impact, and level IDs; discover IDs via get_reference_data.
Instructions
Log a new risk in a project. TypeId, StatusId, ImpactId, ProbabilityId, and LevelId are all required. Discover IDs with get_reference_data (entities "riskstatuses", "risktypes", "riskimpacts", "riskprobabilities", "risklevels"); localized Ids are normalized automatically.
Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| Name | Yes | Risk name (required) | |
| TypeId | Yes | Risk type ID (required; entity "risktypes") | |
| LevelId | Yes | Risk level ID (required; entity "risklevels") | |
| ImpactId | Yes | Risk impact ID (required; entity "riskimpacts") | |
| StatusId | Yes | Risk status ID (required; entity "riskstatuses") | |
| projectId | Yes | The project ID to create the risk in | |
| Description | No | Risk description | |
| ProbabilityId | Yes | Risk probability ID (required; entity "riskprobabilities") | |
| MitigationPlan | No | Mitigation plan description |