get_phase_8_guidance
Get step-by-step guidance for Phase 8 residual risk analysis, including objectives, steps, tools, and expected outputs.
Instructions
Get detailed guidance for Phase 8: Residual Risk Analysis.
This tool provides step-by-step guidance for conducting residual risk analysis, including objectives, steps, tools to use, and expected outputs.
Args: ctx: MCP context for logging and error handling
Returns: A markdown-formatted guide for Phase 8
Tool call template
This tool declares no required parameters. Add optional parameters from the input schema as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {},
"name": "get_phase_8_guidance"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
No arguments | |||
Output Schema
| Name | Required | Description | Default |
|---|---|---|---|
| result | Yes |