Set milestones
set_milestonesReplace a goal's 2-6 ordered milestones, each with a metric, target, and due date before the deadline. Include existing IDs to keep steps; use edit_milestone for single changes.
Instructions
Replace the list of 2–6 ordered milestones under the goal, each with a metric, target and due date before the goal deadline. Pass each existing id, or that milestone's steps are deleted. To change one milestone, use edit_milestone.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"milestones": "<milestones>"
},
"name": "set_milestones"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| milestones | Yes |