Edit plan item
edit_plan_itemEdit a yearly aim plan item: mark it done or not done, rename it, change its estimate, area, or links, or set it as the main step; marking done also completes the linked path step.
Instructions
Change one plan item: mark it done or not done, rename it, change its estimate, area or links, or make it the main step. done=true also completes its linked path step.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"itemId": "<itemId>"
},
"name": "edit_plan_item"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| area | No | ||
| date | No | YYYY-MM-DD in the user's timezone | |
| done | No | ||
| title | No | ||
| itemId | Yes | ||
| stepId | No | ||
| leverId | No | ||
| projectId | No | ||
| isMainStep | No | ||
| estimateMin | No |