Skip to main content
Glama
Energy MCP Belgium

Energy MCP Belgium

get_system_imbalance

Read-onlyIdempotent

Retrieve Belgian physical system imbalance in MW for up to 24 hours, showing positive surplus or negative shortage; monitor grid balance, not prices.

Instructions

Retrieve physical Belgian system imbalance in MW, not a price: positive surplus, negative shortage. Instantaneous 1-minute informational values; do not integrate to MWh. Offset-aware start/end, max 24h. Clarify bare 'imbalance' requests lacking MW versus price context.

Tool call template

Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {
      "start": "<start>",
      "end": "<end>"
    },
    "name": "get_system_imbalance"
  }
}

Input Schema

NameRequiredDescriptionDefault
endYesExclusive interval end, ISO 8601 with Z or an explicit offset. UTC quarter-hour aligned, after start and no more than 24 elapsed hours later. Split longer ranges, including 25-hour Belgian DST days.
startYesInclusive interval start, ISO 8601 with Z or an explicit offset (for example 2026-11-17T10:00:00Z). Must align to a UTC quarter-hour; start < end; maximum 24 elapsed hours.

Output Schema

NameRequiredDescriptionDefault
recordsYes
metadataYes

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observedv0.1.0

TDQS

A4.3/5.0
Behavior4/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

Annotations already declare readOnly, idempotent, non-destructive and openWorld, so the safety bar is covered; the description adds non-obvious data semantics (sign convention, 1-minute granularity, no integration to MWh) that an agent cannot infer from structured fields. The offset/max-24h guidance duplicates what the schema already states, so it is not fully additive.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness5/5

Is the description appropriately sized, front-loaded, and free of redundancy?

Dense and front-loaded: identity and unit first, then sign convention, then the integration caveat, then the window constraint and disambiguation note. No sentence is padding; each carries an operational rule.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness5/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

Output schema exists, so return values need no explanation, and the description supplies the semantics an agent most needs before calling: units, sign, resolution, and the 24-hour window. Nothing required to invoke it correctly is missing.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters3/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema description coverage is 100%, so both start and end are already documented in detail, including ISO 8601 offsets, quarter-hour alignment, exclusivity and the 24-hour cap. The description only restates 'offset-aware start/end, max 24h', adding no format or edge-case meaning beyond the schema.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose5/5

Does the description clearly state what the tool does and how it differs from similar tools?

States a specific verb and resource ('Retrieve physical Belgian system imbalance') plus the unit (MW), the sign convention (positive surplus, negative shortage), and explicitly what it is not ('not a price'). This lets an agent separate it from get_imbalance_prices without opening either schema.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines4/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

Adds real usage constraints: instantaneous 1-minute values, 'do not integrate to MWh', and an instruction to clarify bare 'imbalance' requests that lack MW-versus-price context. It implies the price alternative without naming get_imbalance_prices explicitly, which keeps it just short of a full when/when-not/alternative statement.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.