Energy MCP Belgium
This server does not currently have a deployable release on Glama. Follow the repository's setup instructions to install and configure it for your MCP client, including any required credentials and local dependencies.
⚡ Energy MCP Belgium
Structured Belgian electricity-system data for MCP-compatible AI applications.
Energy MCP Belgium exposes read-only MCP tools backed by Elia Open Data, so compatible AI applications can retrieve Belgian generation, load, imbalance and price data without implementing Elia-specific APIs and schemas. The host handles natural language; the server provides structured data and deterministic calculations.
MCP Host
↓
Energy MCP Belgium
↓
Elia Open DataQuickstart
Requires Python 3.11+. From a downloaded or cloned checkout:
python -m venv .venv
# Activate the environment: see commands below.
python -m pip install .
energy-mcp-belgium
# Equivalent: python -m energy_mcp_belgiumActivate with .venv\Scripts\Activate.ps1 in PowerShell, or source .venv/bin/activate in a POSIX shell. The server uses stdio: a bare launch waits for MCP input; it is not an interactive chat prompt. The package is not published on PyPI. Install from the checkout or a locally built wheel; no LLM API key is required.
Configure your MCP host to launch the installed command:
{
"mcpServers": {
"energy-belgium": {"command": "energy-mcp-belgium", "args": []}
}
}The configuration envelope depends on the host. Ensure its PATH includes your environment's executable directory; otherwise use your own absolute installed executable path. See client setup and the Inspector example.
Related MCP server: Luminus
Tools
Tool | Purpose |
| Belgian national measured/upscaled PV power, MW |
| Total, onshore or offshore measured/upscaled wind power, MW |
| Belgian total load including estimated losses, MW |
| Control-area generation preserving both official fuel classifications, MW |
| Physical instantaneous imbalance, MW: positive surplus / negative shortage |
| Settlement and distinct marginal activation prices, EUR/MWh |
| Fetch solar/wind/load power and integrate observed energy, MWh |
| Fetch one series and diagnose coverage, gaps, nulls and grid integrity |
Physical imbalance is not an imbalance price. Specify MW for get_system_imbalance, or EUR/MWh for get_imbalance_prices. Hosts should clarify a bare “imbalance” request. Instantaneous system imbalance is not integrated as energy.
Example
A host can translate “Get Belgian solar generation on 17 November 2026, 10:00–11:00 UTC” into:
{
"name": "get_solar_generation",
"arguments": {"start": "2026-11-17T10:00:00Z", "end": "2026-11-17T11:00:00Z"}
}Abbreviated structured response; the first record is shown:
{
"metadata": {"source": "elia", "dataset_id": "ods209", "unit": "MW", "timezone": "UTC", "resolution_minutes": 15, "record_count": 4},
"records": [{"timestamp": "2026-11-17T10:00:00Z", "values": {"generation_mw": 293.89}, "dimensions": {"region": "Belgium", "gridconnectiontype": "Total"}, "quality_status": null}]
}The four-record example was retrieved from Elia on 19 November 2026 and may be revised. Complete responses also contain source URL, retrieval time, query bounds, null counts, status and caveats. See the tool reference.
Other requests for a compatible host:
Get Belgian solar generation between 10:00 and 12:00 UTC on 17 November 2026.
How much solar energy was produced between 12:00 and 13:00 UTC on that date?
What was the Belgian system imbalance in MW during that hour?
What was the Belgian imbalance price during that hour?
Compare Belgian solar and total wind generation over that period.
Is the Belgian total-load series complete for that period?
Tested with real Belgian energy data 🇧🇪
Validated through the official MCP Inspector and bounded live Elia Open Data calls: 8 MCP tools · 6 Elia datasets · read-only access · deterministic analytics. One real MCP-host configuration was also exercised; model selection remains host-dependent. No certification or endorsement is implied.
See validation methodology → · Run the public demo · Recording guide
Time and calculations
Use ISO 8601 with Z or an explicit UTC offset, UTC quarter-hour aligned boundaries, inclusive start / exclusive end, and at most 24 elapsed hours per request. Bounds protect provider infrastructure and client context; nothing is silently truncated. Naive timestamps and numeric Unix timestamps are rejected.
Belgian local days may contain 92, 96 or 100 quarter-hours. Calculations use UTC elapsed time. Split a 25-hour autumn day into requests of at most 24 hours. See time semantics.
calculate_energy fetches its own solar/wind/load source and computes MW × interval hours → MWh in Python. Missing intervals are not filled; coverage accompanies observed energy. Duplicate or irregular timestamps are rejected where integration would be ambiguous. check_data_quality reports expected/received intervals, missing intervals, nulls, duplicate timestamps, off-grid records, coverage and status. Availability is separate from physical plausibility and provider validation. See analytics.
Limitations
Only Elia is supported, through local stdio MCP. No forecasts, weather, market actions or SolarCast integration are implemented.
Solar uses ods209 from 26 October 2026; legacy solar stitching is not implemented.
Historical records can lag, contain nulls or be revised. Separate calls do not share an immutable snapshot.
Detailed results can be large: a measured 24-hour generation-mix response contained 1,152 records and approximately 534 KB of MCP result. Prefer one-hour windows for mix and minute imbalance, or analytics when only totals/coverage are needed.
Measured client compatibility covers Inspector CLI 2.16.0 (Node 22.23.4) and Codex CLI 0.147.0. Model-driven selection is host-dependent; these are validation examples, not guaranteed behavior for every host/model. No Inspector GUI or remote HTTP deployment is claimed.
Why this exists
Belgian electricity data is published through provider-specific datasets, fields, units and time conventions. Energy MCP Belgium provides a standard tool interface so compatible applications do not need to reimplement those details. Numerical integration belongs in deterministic code rather than model arithmetic.
Documentation and contributing
Software is MIT licensed. Elia data retains its own Elia Open Data Licence; the software license does not cover that data. Contains information from Elia Transmission Belgium SA, normalized with attribution and provenance. No production or security certification is claimed.
Related project
SolarCast Belgium focuses on energy forecasting and model benchmarking. Energy MCP Belgium focuses on structured access to Belgian electricity-system data for MCP-compatible applications. There is no dependency or implemented integration between them.
Tool Schema Changelog
Recent tool additions, removals, and schema changes observed during successful MCP inspections.
Loading tool schema changelog…
This server cannot be deployed
Maintenance
Related MCP Connectors
Real-time electricity price signals for AI agents. Spot prices, cheapest hours, and contract recommendations. 31 countries across Europe and Oceania. No authentication required.
European power-market data: day-ahead & balancing prices, load, generation, flows, outages. 47 zones
Real-time electricity prices for AI agents. 40+ countries, 100+ zones. No auth required.
One MCP and REST API giving AI agents sourced figures on economics, markets, companies and calendars
Related MCP Servers
- AlicenseAqualityFmaintenanceOne-call Australian energy-market plumbing via AEMO — cited, structured responses for market data and analysis, not a data broker.5196 PyPIMIT
- AlicenseBqualityBmaintenanceProvides real-time European and GB electricity grid data via MCP, including generation, prices, carbon intensity, and grid infrastructure.4470 npm7MIT
- FlicenseNot gradedqualityCmaintenanceA read-only MCP server that exposes European day-ahead electricity prices for ~41 bidding zones via tools like hourly prices, cheapest hours, current price, and cross-zone summary, enabling AI agents to query energy market data.1-

Voltcast MCP Serverofficial
AlicenseNot gradedqualityDmaintenanceEnables access to European electricity data including day-ahead prices, probabilistic forecasts, carbon intensity, and cheapest-window optimization for 43 bidding zones.MIT