Skip to main content
Glama
Energy MCP Belgium

Energy MCP Belgium

get_imbalance_prices

Read-onlyIdempotent

Retrieve quarter-hour Belgian BRP settlement and distinct upward/downward marginal activation prices in EUR/MWh for offset-aware intervals up to 24h; data is provisional until validated.

Instructions

Retrieve quarter-hour Belgian BRP settlement and distinct upward/downward marginal activation prices in EUR/MWh, not physical imbalance MW. Offset-aware start/end, max 24h; provisional until validated. No separate positive/negative BRP tariff is invented.

Tool call template

Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {
      "start": "<start>",
      "end": "<end>"
    },
    "name": "get_imbalance_prices"
  }
}

Input Schema

NameRequiredDescriptionDefault
endYesExclusive interval end, ISO 8601 with Z or an explicit offset. UTC quarter-hour aligned, after start and no more than 24 elapsed hours later. Split longer ranges, including 25-hour Belgian DST days.
startYesInclusive interval start, ISO 8601 with Z or an explicit offset (for example 2026-11-17T10:00:00Z). Must align to a UTC quarter-hour; start < end; maximum 24 elapsed hours.

Output Schema

NameRequiredDescriptionDefault
recordsYes
metadataYes

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observedv0.1.0

TDQS

A4.1/5.0
Behavior4/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

Annotations already cover read-only, idempotent, non-destructive, open-world behavior, yet the description adds genuinely non-obvious traits: results are provisional until validated, price direction is split upward/downward, and no synthetic positive/negative BRP tariff is fabricated. That last caveat about output semantics is valuable but phrased cryptically, keeping it below 5.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness4/5

Is the description appropriately sized, front-loaded, and free of redundancy?

Three dense sentences, front-loaded with the resource and units, with the key constraint (24h) early. The final clause 'No separate positive/negative BRP tariff is invented' is terse to the point of ambiguity but still earns its place as a scope disclaimer.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness4/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

An output schema exists, so return values need not be described, and the description covers units, data-quality status, interval bounds and range limits. What remains thin is whether the two price directions are returned as separate series or as fields, which an agent might wonder about before calling.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters3/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema coverage is 100%, and the schema already documents inclusive/exclusive semantics, offset handling, quarter-hour alignment and the 24-hour ceiling in more detail than the description. The description's 'Offset-aware start/end, max 24h' merely echoes the schema, so baseline 3 is appropriate.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose5/5

Does the description clearly state what the tool does and how it differs from similar tools?

Specific verb (Retrieve) plus a precise resource: quarter-hour Belgian BRP settlement and distinct upward/downward marginal activation prices, with units (EUR/MWh) stated. It explicitly distinguishes itself from the physical-imbalance sibling by saying 'not physical imbalance MW', so an agent can route correctly without opening the schema.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines4/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

The 'not physical imbalance MW' clause implicitly routes physical-imbalance queries to get_system_imbalance, and the max-24h rule tells the agent when to split ranges. It lacks an explicit 'use this when…' sentence and never names the alternative tool outright, so a 4 rather than 5.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.