Wattlas — US Data Center Intelligence
Server Details
US data center projects, local moratoriums, power markets, and cited government filings.
- Status
- Healthy
- Uptime
- 100.0% over the last 24 hours
- Last Tested
- Transport
- Streamable HTTP · MCP 2025-11-25
- URL
- ChatGPT
- –
- Claude
- –
TDQS
Score is being calculated.
Available Tools
10 toolscheck_moratoriumsCheck US Data Center MoratoriumsRead-onlyIdempotentInspect
Check active, pending, extended, and expired US city, county, and township data center moratoriums and zoning bans with status, date, and source links.
Inputs: city, limit, state, county, +1 more.
get_campus_dossierGet Full Campus DossierRead-onlyIdempotentInspect
Retrieve a detailed campus dossier by campus ID (c_...) or public slug, including modular sections for grid/utility, water/energy use, backup diesel/EPA, parcel/site facts, satellite aerial vision, opposition, jobs, and cleared filings. Three public sample campuses work without sign-in; all other campuses require Wattlas Pro.
Inputs: campus_id (required), sections.
get_campus_oppositionGet Local Opposition & Risk SignalsRead-onlyIdempotentInspect
Retrieve local data center opposition signals including moratorium ordinances, petitions, contested lawsuits, and community threads by campus ID, state, or county (requires Wattlas Pro).
Inputs: kind, limit, state, county, +1 more.
get_metro_marketUS Data Center Metro Market ProfileRead-onlyIdempotentInspect
Inspect US data center metro markets: pipeline and construction campus counts, disclosed MW, ISO region, industrial electricity rates, Sentinel-2 clearing activity, and local moratorium counts.
Inputs: iso, limit, metro, state.
get_pipeline_summaryUS Data Center Pipeline SummaryRead-onlyIdempotentInspect
Summarize confirmed US data center pipeline, operating, and unconfirmed campus counts and disclosed vs. estimated megawatt coverage by state or stage.
Inputs: group, stage, state.
get_site_rankingsRank Campuses by Infrastructure SignalRead-onlyIdempotentInspect
Rank US data center campuses by permitted backup diesel MW, disclosed water use, WRI water stress, Sentinel-2 earthwork ahead of permit stage, pipeline MW, or rising industrial power rates (requires Wattlas Pro).
Inputs: metric (required), group, limit, state.
list_filingsList Cleared Government FilingsRead-onlyIdempotentInspect
List cleared primary-source government and civic data center filings by campus ID, state, county, stage, or date range with direct official URLs (requires Wattlas Pro).
Inputs: limit, stage, state, county, +3 more.
search_campusesSearch US Data Center CampusesRead-onlyIdempotentInspect
Search US data center campuses across Pipeline, Operating, and Unconfirmed groups by name, location, stage, owner, ISO, megawatts, moratorium, or water risk. Free accounts return public fields; Wattlas Pro unlocks all campuses and deep filters.
Inputs: iso, city, group, limit, +9 more.
search_jobsSearch US Data Center JobsRead-onlyIdempotentInspect
Search open US data center construction, engineering, commissioning, and operations roles by state, city, employer, or keyword.
Inputs: city, limit, query, state, +1 more.
search_ownersSearch Owners, Developers & TenantsRead-onlyIdempotentInspect
Look up data center owners, developers, operators, or tenants and inspect their US campus portfolio, total disclosed MW, states, and corporate links (requires Wattlas Pro).
Inputs: query (required), role, limit, state.
Tool Schema Changelog
Recent tool additions, removals, and schema changes observed during successful MCP inspections.
Loading tool schema changelog…
Related MCP Connectors
AI infrastructure tracker: data center campuses, power projects, MW and the companies behind them
US AI data-center projects from public records: tenants, air permits, turbines, resolved to tickers
Dated European data-centre markets, projects, grid connection limits, country rules and live grid.
Paid US data center API: projects, county power, deals and legislation from public sources.
Related MCP Servers
- FlicenseNot gradedqualityCmaintenanceEnables searching US AI data-center projects drawn from public records — certifications, air permits, and agendas — with tenants and operators resolved to stock tickers and first-seen dates. Supports querying new dated events, project details, and ticker-level exposure, equipment, pipeline trends, and CSV/Parquet exports.-
- AlicenseAqualityAmaintenanceThe orchestration layer for data center and energy intelligence. Find power. Find land. Find fiber. Find capacity. Start with execute_plan. Try: Use DC Hub execute_plan: how long is time-to-power for 100 MW in PJM? Data Center Power Index (DCPI) BUILD/CAUTION/AVOID via get_market_dcpi_rank and analyze_site. DCHUB_API_KEY is optional; a key keeps saved shortlists, alerts and get_changes.991,258 npm3MIT
- AlicenseNot gradedqualityCmaintenanceEnables AI agents to answer data-center siting questions by querying a live facility registry, per-metro market intelligence, real-time grid fuel mix and demand, and leasable capacity listings, including a one-call planner that combines these into ranked, cited answers. Results are fetched live per request, keyless, with optional API keys for fuller responses.61 npmMIT

security-orchestraofficial
FlicenseNot gradedqualityCmaintenanceProvides deterministic, standards-based calculations for data center critical power infrastructure. Enables site selection, generator sizing, UPS sizing, NFPA 110 compliance, and more via 50+ AI agents and 8 compound chains.-
Glama MCP Gateway
Add one secure layer between your agents and this server.