Skip to main content
Glama

Wattlas — US Data Center Intelligence

Server Details

US data center projects, local moratoriums, power markets, and cited government filings.

If you are the author of this connector, you can claim ownership. Claimed connector authors can inspect health checks, view analytics, and manage their listing.
Status
Healthy
Uptime
100.0% over the last 24 hours
Last Tested
Transport
Streamable HTTP · MCP 2025-11-25
URL
ChatGPT
–
Claude
–

TDQS

Score is being calculated.

Available Tools

10 tools
check_moratoriumsCheck US Data Center Moratoriums
Read-onlyIdempotent
Inspect

Check active, pending, extended, and expired US city, county, and township data center moratoriums and zoning bans with status, date, and source links.

Inputs: city, limit, state, county, +1 more.

get_campus_dossierGet Full Campus Dossier
Read-onlyIdempotent
Inspect

Retrieve a detailed campus dossier by campus ID (c_...) or public slug, including modular sections for grid/utility, water/energy use, backup diesel/EPA, parcel/site facts, satellite aerial vision, opposition, jobs, and cleared filings. Three public sample campuses work without sign-in; all other campuses require Wattlas Pro.

Inputs: campus_id (required), sections.

get_campus_oppositionGet Local Opposition & Risk Signals
Read-onlyIdempotent
Inspect

Retrieve local data center opposition signals including moratorium ordinances, petitions, contested lawsuits, and community threads by campus ID, state, or county (requires Wattlas Pro).

Inputs: kind, limit, state, county, +1 more.

get_metro_marketUS Data Center Metro Market Profile
Read-onlyIdempotent
Inspect

Inspect US data center metro markets: pipeline and construction campus counts, disclosed MW, ISO region, industrial electricity rates, Sentinel-2 clearing activity, and local moratorium counts.

Inputs: iso, limit, metro, state.

get_pipeline_summaryUS Data Center Pipeline Summary
Read-onlyIdempotent
Inspect

Summarize confirmed US data center pipeline, operating, and unconfirmed campus counts and disclosed vs. estimated megawatt coverage by state or stage.

Inputs: group, stage, state.

get_site_rankingsRank Campuses by Infrastructure Signal
Read-onlyIdempotent
Inspect

Rank US data center campuses by permitted backup diesel MW, disclosed water use, WRI water stress, Sentinel-2 earthwork ahead of permit stage, pipeline MW, or rising industrial power rates (requires Wattlas Pro).

Inputs: metric (required), group, limit, state.

list_filingsList Cleared Government Filings
Read-onlyIdempotent
Inspect

List cleared primary-source government and civic data center filings by campus ID, state, county, stage, or date range with direct official URLs (requires Wattlas Pro).

Inputs: limit, stage, state, county, +3 more.

search_campusesSearch US Data Center Campuses
Read-onlyIdempotent
Inspect

Search US data center campuses across Pipeline, Operating, and Unconfirmed groups by name, location, stage, owner, ISO, megawatts, moratorium, or water risk. Free accounts return public fields; Wattlas Pro unlocks all campuses and deep filters.

Inputs: iso, city, group, limit, +9 more.

search_jobsSearch US Data Center Jobs
Read-onlyIdempotent
Inspect

Search open US data center construction, engineering, commissioning, and operations roles by state, city, employer, or keyword.

Inputs: city, limit, query, state, +1 more.

search_ownersSearch Owners, Developers & Tenants
Read-onlyIdempotent
Inspect

Look up data center owners, developers, operators, or tenants and inspect their US campus portfolio, total disclosed MW, states, and corporate links (requires Wattlas Pro).

Inputs: query (required), role, limit, state.

Tool Schema Changelog

Recent tool additions, removals, and schema changes observed during successful MCP inspections.

Loading tool schema changelog…

    Related MCP Connectors

    Related MCP Servers

    • F
      license
      Not graded
      quality
      C
      maintenance
      Enables searching US AI data-center projects drawn from public records — certifications, air permits, and agendas — with tenants and operators resolved to stock tickers and first-seen dates. Supports querying new dated events, project details, and ticker-level exposure, equipment, pipeline trends, and CSV/Parquet exports.
      -
    • A
      license
      A
      quality
      A
      maintenance
      The orchestration layer for data center and energy intelligence. Find power. Find land. Find fiber. Find capacity. Start with execute_plan. Try: Use DC Hub execute_plan: how long is time-to-power for 100 MW in PJM? Data Center Power Index (DCPI) BUILD/CAUTION/AVOID via get_market_dcpi_rank and analyze_site. DCHUB_API_KEY is optional; a key keeps saved shortlists, alerts and get_changes.
      99
      1,258 npm
      3
      MIT
    • A
      license
      Not graded
      quality
      C
      maintenance
      Enables AI agents to answer data-center siting questions by querying a live facility registry, per-metro market intelligence, real-time grid fuel mix and demand, and leasable capacity listings, including a one-call planner that combines these into ranked, cited answers. Results are fetched live per request, keyless, with optional API keys for fuller responses.
      61 npm
      MIT
    • F
      license
      Not graded
      quality
      C
      maintenance
      Provides deterministic, standards-based calculations for data center critical power infrastructure. Enables site selection, generator sizing, UPS sizing, NFPA 110 compliance, and more via 50+ AI agents and 8 compound chains.
      -
    Try in Browser

    Glama MCP Gateway

    Add one secure layer between your agents and this server.

    Resources