Skip to main content
Glama

DC Blueprint data-centre intelligence

Server Details

Dated European data-centre markets, projects, grid connection limits, country rules and live grid.

If you are the author of this connector, you can claim ownership. Claimed connector authors can inspect health checks, view analytics, and manage their listing.
Status
Healthy
Uptime
100.0% over the last 24 hours
Last Tested
Transport
Streamable HTTP · MCP 2025-11-25
URL
ChatGPT
–
Claude
–

TDQS

A3.9/5.0

Scored across 7 tools

Disambiguation4/5

Each tool has a recognisable niche: business case figures, market overview, rules, live grid carbon/price, grid connection status, project lists and site search. The only real overlap is between data_centre_market_overview (which already returns counts and the first three tracked projects) and market_projects, so an agent may occasionally pick the wrong one for a 'show me projects' query, but the descriptions mostly sort this out.

Naming Consistency4/5

Six of the seven names are consistent snake_case noun phrases describing the resource returned (data_centre_rules, grid_carbon_and_price_now, market_projects, business_case_figures). The single verb-first outlier, search_dcblueprint, breaks the pattern (and embeds a brand name), but the set is far from chaotic.

Tool Count5/5

Seven tools is a well-scoped surface for a data-centre intelligence product: one per major dataset plus a search entry point. No tool looks redundant or padded, and nothing essential appears crammed into a catch-all.

Completeness4/5

The surface covers markets, projects, regulation, grid carbon/price, connection restrictions, business case economics and page search, so core question types are answerable. Gaps are moderate: no operator or facility detail endpoint (only reachable via search), no cross-market comparison for business case figures, and no account/credit check tool despite credit-based access.

Available Tools

7 tools
business_case_figuresData-centre business-case figures for one marketA
Read-onlyIdempotent
Inspect

The inputs of a colocation data-centre business case for one European market: construction cost per MW, colocation prices per kW-month, electricity price, staff cost, guarding, property tax, exit yield, grid wait, permitting and grid charges, with low and high. Answers with no key: the market's build cost per MW with its low-to-high range, the date, the market page and its rank in the European Build Cost Index, free on every call. All figures need a personal DC Blueprint key (Authorization: Bearer) from an account with a DC Blueprint licence or trial. One market a call: every figure costs 5 credits, one figure (the "figure" argument) 1; the same answer again in the calendar month costs nothing. Markets: Amsterdam, Athens, Barcelona, Berlin, Bristol, Brussels, Central Scotland, Copenhagen, Dublin, Frankfurt, Helsinki, Lille, Lisbon, London, Lyon, Madrid, Marseille, Milan, Munich, Oslo, Paris, Prague, Rhineland, Rome, Stockholm, Vienna, Warsaw, Zagreb, Zaragoza, Zurich. Figures: Construction cost, Colocation price, retail, Colocation price, wholesale, Colocation price, large deals, Electricity price, Cost of a site employee, Guarding and monitoring, Property tax, Exit yield, Wait for a grid connection, Permitting, Grid connection charge, Customer substation. Each figure carries its trust level (high, medium or low).

Inputs: market (required), figure.

data_centre_market_overviewData-centre market overview (Europe)A
Read-onlyIdempotent
Inspect

Dated overview of a European data-centre market: how many data-centre projects of 500 kW or more our pipeline tracker lists and how many are permitted or being built, the facility power by stage (IT load and MVA converted, marked ≈), who develops the most of them, whether new grid connections are paused, rationed or conditional in that country, the grid carbon intensity and power price this hour, how many operating data-centre sites we track there (at least), its first three tracked projects, a dated one-sentence reading of the market with a class word for land, permitting, grid connection, power, cooling and more (words, no figures), and how many data-centre rules apply. Use for questions like "data centres in Germany", "Frankfurt data centre market", "who is building data centres in Spain". Metros: London, Frankfurt, Paris, Amsterdam, Dublin, Milan, Madrid, Central Scotland, Zaragoza, Helsinki, Zurich, Berlin, Athens, Lille, Lyon, Rhineland, Rome, Warsaw, Barcelona, Copenhagen, Lisbon, Oslo, Stockholm, Zagreb, Bristol, Brussels, Marseille, Munich, Prague, Vienna. Countries: United Kingdom, Germany, Italy, Spain, France, Finland, Norway, Netherlands, Ireland, Poland, Sweden, Greece, Switzerland, Denmark, Portugal, Belgium, Czechia, Romania, Bulgaria, Croatia, Estonia, Austria, Lithuania, Slovakia, Hungary, Latvia, Luxembourg, Slovenia.

Inputs: market (required).

data_centre_rulesData-centre rules and deadlines by countryB
Read-onlyIdempotent
Inspect

The national and EU rules for building and running a data centre in one European country (energy efficiency reporting, waste heat, permitting, grid), each with its status, who it applies to and the next date that matters, plus upcoming deadlines. Countries: Germany, France, Ireland, Netherlands, Italy, Spain, Sweden, Finland, Denmark, Poland, United Kingdom, Belgium, Czechia, Portugal, Switzerland, Norway, Greece, Austria, Hungary, Croatia, Lithuania, Latvia, Estonia, Romania, Bulgaria, Slovakia, Slovenia, Cyprus, Malta, Luxembourg, United States.

Inputs: country (required).

grid_carbon_and_price_nowGrid carbon intensity and power price nowA
Read-only
Inspect

This hour's grid carbon intensity (gCO2/kWh), renewable share and day-ahead power price for a European market, the cleanest window in the next hours and its rank among 15 markets. Without a market: all markets ranked cleanest first. Markets: Germany, United Kingdom, France, Netherlands, Ireland, Italy (North), Spain, Poland, Belgium, Austria, Switzerland, Norway (NO2), Sweden (SE3), Denmark (DK1), Finland.

Inputs: market.

grid_connection_statusGrid connection status for data centres (Europe)A
Read-onlyIdempotent
Inspect

Where in Europe new grid connections for data centres are paused, rationed, conditional or congested, by country, with the measure's name, what it applies to and when it started. Without a country: the whole ranking. Use for questions like "where can I still connect a data centre to the grid in Europe", "is Ireland's grid moratorium still in force".

Inputs: country.

market_projectsTracked data-centre projects of one marketA
Read-onlyIdempotent
Inspect

Every data-centre project our pipeline tracker lists in one European market, latest stage first: name, stage, stated MW, the date it was last checked and its page. Needs a personal DC Blueprint key (Authorization: Bearer) from an account with a DC Blueprint licence or trial. The market costs 1 credit; the same list again in the calendar month costs nothing. A list longer than 25 projects comes in pages (the "page" argument). Metros: London, Frankfurt, Paris, Amsterdam, Dublin, Milan, Madrid, Central Scotland, Zaragoza, Helsinki, Zurich, Berlin, Athens, Lille, Lyon, Rhineland, Rome, Warsaw, Barcelona, Copenhagen, Lisbon, Oslo, Stockholm, Zagreb, Bristol, Brussels, Marseille, Munich, Prague, Vienna. Countries: United Kingdom, Germany, Italy, Spain, France, Finland, Norway, Netherlands, Ireland, Poland, Sweden, Greece, Switzerland, Denmark, Portugal, Belgium, Czechia, Romania, Bulgaria, Croatia, Estonia, Austria, Lithuania, Slovakia, Hungary, Latvia, Luxembourg, Slovenia.

Inputs: market (required), page.

search_dcblueprintSearch DC BlueprintA
Read-onlyIdempotent
Inspect

Search DC Blueprint's pages: the four steps, the European market pages, the trackers (data-centre pipeline, grid connections, tenders, substation headroom), the Insights articles, the glossary, the operator pages and the facility pages. Returns up to 5 pages, best match first, with title, date, link and summary.

Inputs: query (required).

Tool Schema Changelog

Recent tool additions, removals, and schema changes observed during successful MCP inspections.

Loading tool schema changelog…

    Related MCP Connectors

    Related MCP Servers

    • A
      license
      A
      quality
      A
      maintenance
      DC Hub is the orchestration layer for data center and energy intelligence: start with execute_plan. Data center site selection, colocation, energy and electricity prices, power grid, fiber and capacity, plus the Data Center Power Index (DCPI). New capacity listings (pocket listings) are coming soon via source_capacity at https://dchub.cloud/listings. 97 tools. Endpoint: https://dchub.cloud/mcp.
      97
      2,221 npm
      3
      MIT
    • A
      license
      Not graded
      quality
      C
      maintenance
      Enables AI agents to answer data-center siting questions by querying a live facility registry, per-metro market intelligence, real-time grid fuel mix and demand, and leasable capacity listings, including a one-call planner that combines these into ranked, cited answers. Results are fetched live per request, keyless, with optional API keys for fuller responses.
      89 npm
      MIT
    • A
      license
      Not graded
      quality
      B
      maintenance
      DC Hub is the orchestration layer for data center and energy intelligence: start with execute_plan for electricity prices, power grid, site selection, interconnection, fiber, natural gas, colocation. Data Center Power Index (DCPI) and live ISO grid feeds. 97 tools. Endpoint: https://dchub.cloud/mcp. New data center capacity listings coming soon via source_capacity at https://dchub.cloud/listings.
      MIT
    • F
      license
      Not graded
      quality
      C
      maintenance
      Provides deterministic, standards-based calculations for data center critical power infrastructure. Enables site selection, generator sizing, UPS sizing, NFPA 110 compliance, and more via 50+ AI agents and 8 compound chains.
      -
    Try in Browser

    Glama MCP Gateway

    Add one secure layer between your agents and this server.

    Resources