Rank Campuses by Infrastructure Signal
get_site_rankingsRank US data center campuses by permitted backup diesel MW, disclosed water use, WRI water stress, Sentinel-2 earthwork ahead of permit stage, pipeline MW, or rising industrial power rates (requires Wattlas Pro).
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"metric": "<metric>"
},
"name": "get_site_rankings"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| group | No | Campus cohort: confirmed pipeline, operating, unconfirmed, or all. | |
| limit | No | Maximum number of ranked campuses to return (1–25, default 15). | |
| state | No | Two-letter US state code (e.g. VA, TX, OH). | |
| metric | Yes | Infrastructure ranking metric to sort campuses by. |