Harrowgate Group Tools
Server Details
Planning tools for commercial paving and site work.
- Status
- Healthy
- Uptime
- 100.0% over the last 24 hours
- Last Tested
- Transport
- Streamable HTTP · MCP 2025-11-25
- URL
- ChatGPT
- –
- Claude
- –
TDQS
Score is being calculated.
Available Tools
12 toolsaccessible_parking_calculatorAccessible Parking and Line Striping CalculatorRead-onlyIdempotentInspect
Minimum accessible parking spaces for a new or redeveloped Ontario lot under Ontario Regulation 191/11 section 80.36, the Type A and Type B split, access aisles and painted stall line length. Every parameter is optional and has a default. Preliminary planning only. Municipal zoning by-laws and the Building Code can add requirements, and the designer of record governs.
Inputs: rows, units, spaces, stall_length.
asphalt_concrete_calculatorAsphalt and Concrete CalculatorRead-onlyIdempotentInspect
Tonnes of hot mix asphalt for a paving area, or cubic metres and truck loads of ready-mix concrete for a slab, footing or column. Every parameter is optional and has a default. Material estimate from the numbers entered. It is not a quote and does not include base, forming, reinforcing or site conditions.
Inputs: how, area, mode, count, +11 more.
concrete_slab_thickness_and_reinforcing_guideConcrete Slab Thickness, Joints and Reinforcing GuideRead-onlyIdempotentInspect
Minimum slab thickness, subbase, joint spacing, joint depth and reinforcing notes for a walk, patio, driveway, parking lot or truck pad, from published ready-mix concrete association guidance. Every parameter is optional and has a default. Guidance only, not a slab design. Loads, soil, frost, drainage, concrete mix and the municipal or project specification decide the final thickness and reinforcing, and an engineer designs parking lots, truck pads and anything carrying heavy equipment.
Inputs: use, units, width, length, +2 more.
curb_sidewalk_concrete_calculatorCurb and Sidewalk Concrete CalculatorRead-onlyIdempotentInspect
Concrete volume, order quantity and ready-mix truck loads for a run of sidewalk, curb or curb and gutter, with an Ontario accessible path width check. Every parameter is optional and has a default. Preliminary planning only. A volume is one input to a quote; base, forming, reinforcing, joints, drainage and the municipal standard drawing also matter, and the engineer of record governs.
Inputs: truck, units, waste, width, +7 more.
excavation_spoil_volume_calculatorExcavation and Spoil Volume CalculatorRead-onlyIdempotentInspect
Bank volume, loose volume after swell and truck loads for a trench or pit, with vertical or sloped walls. Every parameter is optional and has a default. Preliminary planning only. Swell factors are planning values; use your geotechnical figure where you have one. The engineer of record and conditions on site govern.
Inputs: depth, sides, slope, swell, +5 more.
excess_soil_tracker_and_reuse_site_checkerExcess Soil Rules and Record-Keeping CheckerRead-onlyIdempotentInspect
Which parts of Ontario Regulation 406/19 apply to a soil removal project or a reuse site, and the records to keep, based on soil volume, past land use and where the soil is going. Every parameter is optional and has a default. General information on the regulation, not legal or environmental advice. A qualified person under Ontario Regulation 153/04 prepares the assessments and reports, and the Soil Rules and the Registry forms set the detail. Confirm with your qualified person or the Ministry.
Inputs: pca, role, urgent, volume, +9 more.
gravel_and_granular_base_calculatorGravel and Granular Base CalculatorRead-onlyIdempotentInspect
Tonnes, cubic metres, truck loads and the number of compaction lifts for a Granular A or Granular B base, using the 150 mm lift limit in Toronto standard specification TS 501. Every parameter is optional and has a default. Preliminary planning only. The project specification, the geotechnical report and your supplier's weights govern. The default weight per cubic metre is a general federal stone conversion, not a Granular A or Granular B test result.
Inputs: depth, truck, units, width, +5 more.
hydro_excavation_vs_mechanical_checkerHydro Excavation or Mechanical Digging Near Buried Electrical LinesRead-onlyIdempotentInspect
Which excavation method the Electrical Safety Authority guideline allows near a located underground electrical distribution line: hand, vacuum (hydro) or machine. Every parameter is optional and has a default. Preliminary planning only. This covers electrical distribution lines only; gas, communication, water and sewer owners set their own requirements, and the instructions on your locate form govern.
Inputs: area, units, locate, method, +3 more.
parking_lot_striping_and_stall_layout_calculatorParking Lot Striping and Stall Layout CalculatorRead-onlyIdempotentInspect
Stalls per row, rows, total stalls, painted stall line length and the minimum accessible spaces for a lot, using the stall sizes and drive aisle widths in Toronto Zoning By-law 569-2013 and the accessible count in Ontario Regulation 191/11. Every parameter is optional and has a default. Preliminary layout only. Other municipalities set their own stall sizes and aisle widths, and a site plan must meet the zoning by-law, fire route, drainage and accessibility rules that apply to the site. Confirm with your municipality.
Inputs: angle, units, lot_depth, lot_width, +2 more.
rebar_quantity_calculatorRebar Quantity CalculatorRead-onlyIdempotentInspect
Bar count, total length, stock bars and mass for a slab or pad mat or a strip footing, using CSA G30.18 metric bar sizes. Every parameter is optional and has a default. Preliminary planning only. Take the bar list, cover, laps and hooks from the drawings; the engineer of record governs.
Inputs: bar, lap, cover, stock, +8 more.
snow_load_and_snow_removal_volume_calculatorSnow Removal Volume, Weight and Pile Footprint CalculatorRead-onlyIdempotentInspect
Cubic metres, weight and truck loads of snow from a lot area and snow depth, with the footprint and base width of a snow pile of a chosen height. Every parameter is optional and has a default. Planning estimate only. Real snow varies with temperature, wind, rain and time on the ground, and real piles are windrows, not cones. Weigh or measure loads when it matters, for example for roof loads or truck limits.
Inputs: area, depth, truck, units, +4 more.
trench_shoring_checkerTrench Shoring Requirement CheckerRead-onlyIdempotentInspect
Whether Ontario Regulation 213/91 requires a support system for an excavation, by depth, width and soil type, which kinds are permitted, and which other excavation rules apply. Every parameter is optional and has a default. Preliminary planning only. Regulations are amended from time to time; confirm against the current consolidation. The engineer of record and the competent person on site govern.
Inputs: soil, wall, depth, enter, +5 more.
Tool Schema Changelog
Recent tool additions, removals, and schema changes observed during successful MCP inspections.
Loading tool schema changelog…
Related MCP Connectors
Planning tools for commercial and industrial construction.
1Planning calculators for structural framing and building projects.
1Planning calculators for metal grating, drainage covers and fabrication.
1Planning calculators for custom homes, additions and major renovations.
1
Related MCP Servers
- FlicenseNot gradedqualityDmaintenanceProvides software development planning tools to help users create implementation plans and manage todo items.3-
- AlicenseNot gradedqualityNot gradedmaintenanceProvides structured task planning and tracking capabilities with 40 tools for managing requirements, solutions, architectural decisions, and hierarchical implementation phases with progress tracking.MIT
- FlicenseNot gradedqualityBmaintenanceRuns 15 construction takeoff calculators — concrete, rebar, gravel, fill dirt, sand, topsoil, asphalt, lumber, roofing, fence, duct and paver base — directly from an MCP client, alongside a tool that lists them and a searchable table of source-cited estimating constants. Each call is computed by the bundled TakeoffMetric engine and returns structured quantities, order amounts, costs, warnings and assumptions.73 npm-
- AlicenseNot gradedqualityCmaintenancePlan optimal container & truck loads: 3D layouts, right-size the container mix, and check utilization, centre of gravity, crush protection and securing across 200+ equipment types.8 npm2MIT
Glama MCP Gateway
Add one secure layer between your agents and this server.