Skip to main content
Glama

Ampworth calculators

Server Details

UK solar PV and heat pump calculators that follow the published MCS methods. Open, no key.

Ownership verified
Status
Healthy
Uptime
100.0% over the last 24 hours
Last Tested
Transport
Streamable HTTP · MCP 2025-11-25
URL
ChatGPT
–
Claude
–

TDQS

A4.2/5.0

Scored across 12 tools

Disambiguation4/5

Each calculator targets a distinct calculation, and the descriptions actively disambiguate the risky pairs (solar_pv_system_size explicitly says to use solar_pv_output when capacity is known). The only mild overlap is heat_pump_size, which also reports running-cost and quoted-size comparisons that heat_pump_running_cost handles in depth, but cross-references keep them separable.

Naming Consistency4/5

All twelve names are consistent snake_case noun phrases describing the calculation, which is readable and predictable within the suite. There is no consistent verb prefix (e.g. list_calculators sits alongside noun-only names like room_heat_loss), so it is not a strict verb_noun convention, but the style is uniform.

Tool Count5/5

Twelve tools sits comfortably in the well-scoped range for a multi-domain MCS calculator suite spanning solar PV, heat pumps and grid connection. Each tool answers a distinct question and none feels redundant padding.

Completeness4/5

Coverage is strong: a full solar PV chain (shading, output, self-consumption, system sizing), a full heat pump chain (heat loss, emitters, sizing, hot water, noise, running cost), plus connection routing and a reference-data lister. Minor gaps remain, notably no standalone battery/export-tariff or cost/payback calculator, though some of this is folded into solar_pv_system_size.

Available Tools

12 tools
connection_routeNetwork connection routeA
Read-onlyIdempotent
Inspect

Work out which ENA connection procedure a domestic installation of solar panels, batteries or both falls under: connect first and notify the distribution network operator within 28 days, or apply and wait for approval before anything is connected.

The rules are the ENA's engineering recommendations, not MCS documents: EREC G98 for small installations, EREC G99 for everything larger, and EREC G100 for export limitation. Every test is in amps per phase at a nominal 230 V, and it applies to the premises as a whole, so list EVERY inverter that can export, existing ones included. A battery counts as generation even if it only ever charges from the panels.

The figure that counts is each inverter's registered capacity: its AC rating, or a lower limit the manufacturer has fixed. It is NOT the panels' kWp. A 4.4 kWp array on a 3.68 kW inverter is a 3.68 kW installation. Where an inverter has been capped below its hardware rating, give the hardware rating as 'designCapacityKw', because G99 tests that separately.

The routes are: G98 when the total is 16 A per phase or less (3.68 kW single phase, 11.04 kW three phase); G99 SGI-1, also connect and notify, when the total is within 16 A but an inverter built for up to 32 A has been capped; G99 SGI-2 and SGI-3, fast track applications answered within 10 working days, which allow larger totals held back by a type-tested export limiter; and the standard G99 application for anything else. An export limiter NEVER brings an installation under G98.

IMPORTANT: this says which procedure applies, not what the operator will decide. Approval depends on the local network, which only the operator can assess. Say so whenever you report a result.

Method from EREC G98 / G99. These calculators follow the published MCS methods, for understanding a system and checking a quotation. Anything that gets installed still needs a design and a site survey from a certified installer.

Inputs: devices (required), phases, exportLimitKw, otherInstallationsNearby. Returns: notes, route, method, phases, +9 more

heat_pump_noiseHeat pump noise assessmentA
Read-onlyIdempotent
Inspect

Calculate the sound pressure level an air source heat pump produces at an assessment position, and whether it meets the 37 dB(A) permitted development noise limit, using the method in MCS 020.

The formula is Lp = Lw + 10 log(Q / 4.pi.r^2) - Ab.

Lw is the A-weighted sound POWER level of the unit from its product fiche, energy label or the MCS product database. This is not the sound pressure level, which is a smaller number that already has a distance built into it; confusing the two produces an answer that is wrong by about twenty decibels. The figure for low noise mode must not be used.

Q is the directivity factor, from the count of reflecting surfaces within one metre of the unit that extend at least a metre past it in two or more directions. The ground counts; vegetation does not. One surface gives Q=2, two gives Q=4, three gives Q=8. More than three cannot meet MCS 020 at all.

r is the straight-line distance in metres to the assessment position, which is a window or door of a habitable room in a NEIGHBOURING property, at any floor. Every affected position must be checked separately, and the nearest is not always the worst.

Ab is the barrier attenuation. Fences with gaps, and vegetation of any kind, count as no barrier.

Where several units serve one position, list them all and they are combined logarithmically.

Method from MCS 020. These calculators follow the published MCS methods, for understanding a system and checking a quotation. Anything that gets installed still needs a design and a site survey from a certified installer.

Inputs: units (required). Returns: limit, notes, units, method, +6 more

heat_pump_running_costHeat pump running costA
Read-onlyIdempotent
Inspect

Compare what a household spends heating on its current fuel with what the same heat would cost from a heat pump.

The heat demand is worked out from the household's own metered fuel use, not from a model, because a year of bills describes a particular house far better than any estimate of it. Supply the annual fuel use in the fuel's own unit (kWh for gas and electricity, litres for oil and LPG, kilograms for coal), its price per unit in pounds, and the seasonal efficiency of the existing appliance, which defaults to a realistic figure for that fuel instead of the one on the badge.

The comparison turns on one ratio. A heat pump costs less to run whenever its seasonal coefficient of performance beats the ratio between the price of a unit of electricity and the price of a unit of heat from the current fuel. The result reports that break-even figure explicitly.

SCOP must be the figure at the flow temperature the system is actually designed for. The same machine can return 4.2 at 35 degrees and 3.1 at 55, and quoting the first for a system designed at the second is the commonest way of overstating a saving.

This is a running cost comparison. It says nothing about the capital cost or any grant.

Method from MCS 007. These calculators follow the published MCS methods, for understanding a system and checking a quotation. Anything that gets installed still needs a design and a site survey from a certified installer.

Inputs: scop (required), annualFuelUse (required), fuelPricePerUnit (required), electricityPricePerKwh (required), +5 more. Returns: fuel, scop, notes, method, +13 more

heat_pump_sizeWhat size heat pump do I need?A
Read-onlyIdempotent
Inspect

Estimate the heat pump a UK house needs, and what it would cost to run against the fuel it burns now.

IMPORTANT: MIS 3005-D requires a heat pump to be sized from a room-by-room heat loss calculation to BS EN 12831, and nothing here replaces that. Say so whenever you report a result from this, and point the user at the room-by-room calculation. What the figure is for is checking whether a size somebody has been quoted is plausible, because oversizing is the commonest fault in heat pump installations and it is invisible to the person living with it.

There are two routes and the first is much the better one.

From metered fuel, which is preferred: give 'annualFuelUse' from a year of bills. The fuel becomes heat delivered, hot water comes off it using the MIS 3005-D formula, and what remains divided by the local heating degree days gives the building's heat loss coefficient in watts per kelvin. Degree days are computed from the Met Office monthly means published in MGD 007 section 5.

From the fabric, as a fallback when there are no bills: give 'floorAreaM2', an 'insulation' level and a 'propertyType'. The watts per kelvin per square metre behind this are a reasonable reading of British housing stock but they are NOT MCS figures, because MCS publishes no such shortcut. Say so when using this route.

Either way the peak load is the coefficient multiplied by the design temperature difference for the location, from Table 2 of MIS 3005-D. The heat pump must deliver at least that at the design outside temperature and the design flow temperature, which is not the same as its headline rating.

The result also compares what each of four flow temperatures would cost to run, which is the decision that governs the bill and the one a quotation most often leaves unstated. Supply 'quotedHeatPumpKw' to have a quoted size checked against the estimate.

Method from MIS 3005-D. These calculators follow the published MCS methods, for understanding a system and checking a quotation. Anything that gets installed still needs a design and a site survey from a certified installer.

Inputs: location (required), fuel, scop, bedrooms, +14 more. Returns: scop, basis, notes, method, +26 more

hot_water_cylinderHot water demand and cylinder sizeA
Read-onlyIdempotent
Inspect

Work out the daily hot water demand of a dwelling and the size of cylinder a heat pump needs, using the formula in MIS 3005-D 3.5.2 and the BS 6700 guidance reproduced in MGD 007.

The demand is 45 litres a day for each of N, where N is the greater of the number of bedrooms plus one and the number of people actually living there. For a new build, where occupancy is unknown, the bedroom count is used.

The cylinder does not have to hold a whole day's demand, because it reheats as it empties. What it must cover is the largest draw-off before the heat pump catches up, which is why a larger heat pump needs a smaller cylinder: reheat time is volume times temperature rise, divided by 14.3 times the kW.

The result gives the BS 6700 minimum, a recommended size rounded to a volume cylinders are made in, and the reheat time. Note that cylinder volume is not the whole story: a heat pump cylinder needs a much larger coil than a boiler cylinder, because the water arrives cooler and there is less temperature difference to drive heat across the surface.

Method from MIS 3005-D. These calculators follow the published MCS methods, for understanding a system and checking a quotation. Anything that gets installed still needs a design and a site survey from a certified installer.

Inputs: bedrooms (required), bathrooms, occupants, storageTemp, +2 more. Returns: notes, method, bedrooms, bathrooms, +12 more

list_calculatorsList the calculators and their reference dataA
Read-onlyIdempotent
Inspect

Lists every calculator on this server, with the standard behind it and whether it is the whole-system sizing calculator or one of the single-method ones, plus the reference data a caller needs to build a valid request: the compass directions and their orientations, the shading descriptions, the twenty-five solar postcode zones, the eight heat pump design locations with their design temperatures, the room types and their internal design temperatures, the heat loss element kinds, the occupancy archetypes and the fuel types. Call this when a value must be one of a fixed set and you are not sure what the set is.

Returns: notice, reference, calculators

radiator_flow_temperatureRadiator flow temperatureA
Read-onlyIdempotent
Inspect

Work out the flow temperature a heat pump must produce to heat a room through a given radiator, and the resulting MCS Heat Emitter Guide star rating, following section 4 of MGD 007.

This is the calculation that decides whether a heat pump will be cheap or expensive to run. A heat pump's efficiency falls as the water temperature rises, by roughly two to three per cent per degree, and the temperature it must produce is set by the radiators, not by the machine.

Supply the room's design heat loss in watts, from a room-by-room calculation, and the rated output of the radiator in that room. British catalogues normally quote at a mean-water-to-air difference of 50 K; if yours quotes 60, say so and the figure is restated.

The result gives the oversize factor, which is the radiator's output at 50 K divided by the room's heat loss, and converts it to a required flow temperature through the BS EN 442 output law. Star ratings run from 0 to 6, one star per five degrees of flow temperature, with six stars at 35 degrees.

Run this for every room. A house runs at the flow temperature its worst room demands, so one undersized radiator sets the running cost for the whole house.

Method from MGD 007. These calculators follow the published MCS methods, for understanding a system and checking a quotation. Anything that gets installed still needs a design and a site survey from a certified installer.

Inputs: roomHeatLossW (required), radiatorOutputW (required), roomTemp, systemDeltaT, +1 more. Returns: notes, method, verdict, references, +12 more

room_heat_lossRoom heat lossA
Read-onlyIdempotent
Inspect

Calculate the design heat loss of a single room in watts, following BS EN 12831 as MIS 3005-D applies it. This is the figure a heat pump is sized from and the figure the radiator in that room must be able to deliver.

BS EN 12831 is a room-by-room method. Run this once for each heated room and add the results; sizing a heat pump from floor area alone is what produces the oversized installations that cycle all winter.

Internal design temperatures come from Table 1 of MIS 3005-D and follow from the room type: 22 for a bathroom, 21 for living and dining rooms, 18 for bedrooms, halls, kitchens and toilets. These are minimums, so a higher figure is accepted and a lower one is refused.

External design temperatures come from Table 2, for eight locations, in two columns: 'a' is the 99% figure and 'b' the colder 99.6% one, which needs no uplift for intermittent heating.

Each element needs an area, a U-value, and a kind. The kind matters because it fixes which temperature difference applies. Walls, windows, doors, roofs and suspended floors lose heat to the outside design temperature. A SOLID FLOOR ON THE GROUND loses heat to the local annual average air temperature instead, which is far warmer, and getting this wrong is the commonest error in a heat loss calculation. Window and door areas belong to the window and the door, not to the wall behind them.

Method from MIS 3005-D. These calculators follow the published MCS methods, for understanding a system and checking a quotation. Anything that gets installed still needs a design and a site survey from a certified installer.

Inputs: elements (required), location (required), floorAreaM2 (required), roomName, +5 more. Returns: notes, method, elements, location, +15 more

solar_pv_outputSolar PV annual outputA
Read-onlyIdempotent
Inspect

Estimate the annual AC electricity output of a UK solar photovoltaic system, in kWh, using the standard estimation method that MIS 3002 requires every MCS certified installer to use.

The method is: annual output = kWp x Kk x SF, where Kk is read from the MCS irradiance dataset for the site's postcode zone, roof pitch and orientation, and SF is a shade factor between 0 and 1.

Supply the postcode and the array's capacity in kWp, plus the roof's pitch in degrees from horizontal and its orientation in degrees away from due south in either direction, so that south is 0, south-east and south-west are both 45, east and west are both 90, and north is 180.

The result carries the tabulated yield, the estimate, and what the same array would produce at the best pitch and orientation for that zone, so a roof that is merely good is not mistaken for a poor one. This covers the United Kingdom only; the dataset has no values for anywhere else.

Method from MIS 3002. These calculators follow the published MCS methods, for understanding a system and checking a quotation. Anything that gets installed still needs a design and a site survey from a certified installer.

Inputs: capacityKwp (required), inclination (required), orientation (required), zone, +2 more. Returns: zone, notes, method, references, +13 more

solar_pv_self_consumptionSolar PV self-consumptionA
Read-onlyIdempotent
Inspect

Estimate what proportion of a domestic solar PV system's annual output is consumed in the house and what proportion is exported, using the lookup tables in MGD 003.

The tables are not a model. They come from half-hourly monitoring of real British households by Loughborough University, with battery behaviour modelled on top, so they carry the real shape of domestic demand: a peak before the sun is up, another after it has gone, and a quiet middle of the day.

Three things index them. The annual generation, which comes from the MIS 3002 output estimate. The household's annual consumption from a bill based on actual meter readings, which defaults to the British average of 3,500 kWh where it is unknown. And the weekday occupancy pattern, which is 'home_all_day', 'in_half_the_day' or 'out_all_day'; where the pattern is unknown MGD 003 says to use the middle one, and that is what an omitted value resolves to.

Battery capacity is the USABLE capacity, which is smaller than the figure printed on the battery. Supplying import and export prices adds a value in pounds to the result.

Note that self-consumption is not the same as independence from the grid, and the result reports both.

Method from MGD 003. These calculators follow the published MCS methods, for understanding a system and checking a quotation. Anything that gets installed still needs a design and a site survey from a certified installer.

Inputs: annualGenerationKwh (required), occupancy, batteryKwh, exportPricePerKwh, +2 more. Returns: notes, method, occupancy, batteryKwh, +15 more

solar_pv_shadingSolar PV shade factorA
Read-onlyIdempotent
Inspect

Convert a completed MCS sunpath shading assessment into a shade factor, using the procedure in MGD 005.

The MCS sunpath chart is divided into 84 segments, each worth one per cent of the year's useful irradiance. An assessor stands at the middle of where the array will go, plots what blocks the horizon onto the chart, and counts the segments covered. This tool takes that count and returns 1 minus the loss, which is the SF term in the MIS 3002 output estimate.

Objects within ten metres of the array are near shading and are assessed separately, from each affected part of the array, not from its middle. They can be listed here for the record, but MGD 005 is explicit that near shading has a considerable effect and should be avoided.

This tool does not perform the assessment. It does the arithmetic on an assessment somebody made.

Method from MGD 005. These calculators follow the published MCS methods, for understanding a system and checking a quotation. Anything that gets installed still needs a design and a site survey from a certified installer.

Inputs: segments (required), nearObjects. Returns: notes, method, verdict, segments, +7 more

solar_pv_system_sizeWhat size solar system do I need?A
Read-onlyIdempotent
Inspect

Work out the solar PV system a UK home needs: the capacity in kWp, the number of panels, the battery to go with it, and what it would do to the electricity bill.

This runs the MCS arithmetic backwards. The other solar calculators here each answer one question about a system somebody has already specified. This one starts from what a household uses and arrives at the system that covers it, which is the question a householder actually has.

The chain is short and every link is published. Annual consumption sets the generation the array has to make. The MCS irradiance dataset behind MIS 3002 says what one kWp makes on that roof, which gives a capacity. Capacity divided by panel size gives a panel count, rounded up, because panels come whole. The MGD 003 tables then say how much of that generation the household will use and how much it will export.

Only the postcode and the roof direction are required. Direction is a compass point, not an angle: 'S', 'SE', 'SW', 'E', 'W', 'NE', 'NW' or 'N'. Give the annual consumption from a bill if it is known, since the 3,500 kWh default is only the British average. Shading can be described in words instead of measured, and a roof area caps the panel count where the roof is the constraint.

No cost is assumed. Installed prices vary far too much between houses to guess at, so a payback figure appears only when a cost from a real quotation is supplied.

Use this to size a system or to sanity-check a quotation. Use 'solar_pv_output' instead when the capacity is already known and the question is only what it will generate.

Method from MIS 3002. These calculators follow the published MCS methods, for understanding a system and checking a quotation. Anything that gets installed still needs a design and a site survey from a certified installer.

Inputs: postcode (required), direction (required), shading, occupancy, +10 more. Returns: zone, notes, method, panels, +30 more

Tool Schema Changelog

Recent tool additions, removals, and schema changes observed during successful MCP inspections.

Loading tool schema changelog…

    Related MCP Connectors

    Related MCP Servers

    • A
      license
      Not graded
      quality
      B
      maintenance
      UK solar PV and heat pump calculators following the MCS standards, plus home energy guides, as a CLI and local MCP server.
      MIT
    • A
      license
      Not graded
      quality
      C
      maintenance
      Enables turning an address or lat/lng into a transparent solar proposal by geocoding it, pulling Google Solar API building insights (panel layouts, roof segments, imagery quality), and pricing a few system sizes with your tariff, install cost, incentives, savings, payback, NPV and a verdict. Every input is labelled with its source, Google's own financial analyses are shown side by side, and no prices are invented.
      Apache 2.0
    • A
      license
      C
      quality
      C
      maintenance
      27 deterministic engineering compliance and calculation tools for the built environment (data-centre PUE and EED, EPBD, NIS2, Eurocode, UAE compliance), callable by AI agents via MCP and REST API. Free tier; every result cites the governing standard.
      27
      MIT
    • F
      license
      Not graded
      quality
      B
      maintenance
      Enables AI agents to run free, read-only calculators built on official government rules across Ireland, the UK, Canada, Québec, Australia and New Zealand, covering taxes, welfare benefits, pensions, property transaction taxes, parental leave and savings. Every result links the public calculator page and the official sources it relies on, so agents can cite them.
      -
    Try in Browser

    Glama MCP Gateway

    Add one secure layer between your agents and this server.

    Resources