sumo_qa_finishing_qa_work
Finalizes QA rollout by running the final suite, capturing coverage and risk map, and generating a PR-ready summary with markdown documentation.
Instructions
Use at the end of a QA rollout (after sumo-qa-executing-qa-rollout, or after a manual multi-step QA task) to capture evidence, produce a PR-ready summary, and close the loop. Runs the suite one last time, captures coverage / risk-to-test map / open follow-ups, writes a markdown summary to docs/qa/runs/YYYY-MM-DD-.md, and offers to draft the PR description.
Input Schema
TableJSON Schema
| Name | Required | Description | Default |
|---|---|---|---|
No arguments | |||