update_lead
Update a lead's pipeline stage, status, or notes to manage deal flow progress.
Instructions
Update a lead — move them through the pipeline, change their status, or add notes.
Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| id | Yes | The lead ID to update | |
| notes | No | Add or replace notes on the lead | |
| source | No | Update the lead source | |
| lead_status | No | Update lead temperature | |
| funnel_status | No | Move the lead to this pipeline stage |