Skip to main content
Glama
ponisha-mcp

ponisha-mcp

by sepehr071

Project bids

pn_bids
Read-onlyIdempotent

List a Ponisha project's bids to compare offer price, delivery days, pitch, and bidder track record; keep limits small because projects with many bids can take 3–30 seconds.

Instructions

List the offers on a Ponisha project: price (Toman), days, pitch and each bidder's track record.

Slow (3-30 s on projects with many bids): keep limit small.

Tool call template

Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {
      "project_id": "<project_id>"
    },
    "name": "pn_bids"
  }
}

Input Schema

NameRequiredDescriptionDefault
pageNoPage, from 1.
limitNoPer page.
project_idYesProject id.

Schema Changelog

Changes observed during successful MCP inspections.

  1. Changed3 schema fields changedv0.2.0
    • changedInput schema / properties / limit / description
      Previous value: -"Offers per page (max 30)."New value: +"Per page."
    • changedInput schema / properties / page / description
      Previous value: -"Result page, starting at 1."New value: +"Page, from 1."
    • changedInput schema / properties / project_id / description
      Previous value: -"Numeric project id from pn_search_projects, e.g. 762909."New value: +"Project id."
  2. First observedv0.1.0

TDQS

A3.8/5.0
Behavior4/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

Annotations already declare readOnly, idempotent, non-destructive behavior, so safety needs no restating. The description adds genuinely new behavioral context: a 3–30 s latency range on bid-heavy projects and the operational advice to keep limit small, which an agent needs for timeouts and paging strategy.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness5/5

Is the description appropriately sized, front-loaded, and free of redundancy?

Two short sentences, front-loaded with what the tool returns, with the performance caveat separated on its own line. No filler.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness4/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

No output schema exists, so the description correctly compensates by naming the returned fields. Combined with the latency warning and documented pagination params, an agent has enough to call it correctly; only explicit guidance on paging through large bid sets is missing.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters3/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema coverage is 100%, with page, limit, and project_id each documented inline, so the baseline is 3. The description's advice to keep limit small adds useful meaning about the limit parameter, but no further semantics for project_id or paging beyond the schema.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose4/5

Does the description clearly state what the tool does and how it differs from similar tools?

States a specific verb (List) and resource (offers on a Ponisha project) and enumerates the returned fields — price in Toman, days, pitch, bidder track record — so the agent knows exactly what it gets. It does not differentiate from siblings such as pn_project, which likely also touches a project, leaving that inference to the agent.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines3/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

Usage is implied (fetching bids for a known project) and there is practical guidance to keep limit small because of slowness. There is no explicit when-not guidance or pointer to an alternative sibling for related project information.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.