Why no run?
cron_why_no_runExplains field-by-field why a job schedule did or did not select a timestamp, showing previous and next runs plus day-field AND and DST effects. Use it when an expected run is missing.
Instructions
Explain field-by-field why a job's schedule did or did not select a timestamp ('day-of-week Tuesday is not in Monday and Friday'), with the previous and next scheduled runs and notes on this dialect's day-field AND rule and DST effects. Use it when an expected run is missing. If the schedule does match, the answer refers to execution history (cron_list_runs) instead.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"name": "<name>",
"at": "<at>"
},
"name": "cron_why_no_run"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| at | Yes | Timestamp to test, in ISO 8601, such as 2026-10-26T09:00. Without an offset it uses the job's time zone. | |
| name | Yes | Exact job name, as cron_list_jobs returns it. A workflow's schedule is dag:<name>. |
Output Schema
| Name | Required | Description | Default |
|---|---|---|---|
| at | Yes | ||
| job | Yes | ||
| notes | Yes | ||
| checks | Yes | ||
| failed | Yes | ||
| reboot | Yes | ||
| enabled | Yes | ||
| matches | Yes | ||
| resolved | No | ||
| timezone | Yes | ||
| next_fire | Yes | ||
| at_in_zone | No | ||
| expression | Yes | ||
| description | Yes | ||
| previous_fire | Yes |