Schedule load
cron_schedule_pressureVisualize upcoming enabled cron runs grouped by hour and minute to identify scheduling collisions and unused minute slots over a chosen time window.
Instructions
Upcoming runs for enabled schedules over the next hours (default 24, max 168), grouped by hour and minute in tz (default UTC). Shows when jobs are scheduled together and which minute positions have no scheduled runs.
Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| tz | No | ||
| hours | No |