evaluate_contractor_bid
Assess contractor bids against internal cost estimates to flag inflated line items, vague lump sums, and unrealistic timelines before approval.
Instructions
Evaluate a contractor bid against the internal cost estimate.
Flags: inflated line items (30%+ above benchmark), vague lump sums, unrealistic timelines.
Args: contractor_name: Name of the contractor bid_line_items: List of dicts with "description" and "amount" keys bid_total: Total bid amount timeline_days: Proposed timeline in days (None if not specified) unit_sqft: Unit square footage for generating comparison estimate bedrooms: Number of bedrooms bathrooms: Number of bathrooms scope_level: "light" or "standard_value_add" finish_tier: "basic" or "upgraded" year_built: Property year built
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"contractor_name": "<contractor_name>",
"bid_line_items": "<bid_line_items>",
"bid_total": "<bid_total>",
"timeline_days": "<timeline_days>",
"unit_sqft": "<unit_sqft>",
"bedrooms": "<bedrooms>",
"bathrooms": "<bathrooms>"
},
"name": "evaluate_contractor_bid"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| bedrooms | Yes | ||
| bathrooms | Yes | ||
| bid_total | Yes | ||
| unit_sqft | Yes | ||
| year_built | No | ||
| finish_tier | No | basic | |
| scope_level | No | standard_value_add | |
| timeline_days | Yes | ||
| bid_line_items | Yes | ||
| contractor_name | Yes |