plat-costmodel
Click on "Deploy Server".
Wait a few minutes for the server to deploy. Once ready, it will show a "Started" state.
In the chat, type
@followed by the MCP server name and your instructions, e.g., "@plat-costmodel Estimate per-unit renovation cost for a 1985 Class B property in Dallas with 800 sq ft units."
That's it! The server will respond to your query, and you can continue using it as needed.
Here is a step-by-step guide with screenshots.
plat-costmodel
Multifamily renovation cost estimation engine for Plat — a domain-expert real estate intelligence agent.
What It Does
Per-unit cost estimation with line-item breakdowns (flooring, kitchen, bath, paint, appliances, fixtures, contingency)
Scope of Work (SOW) generation — contractor-ready documents from property profile
Contractor bid evaluation — flags inflated line items, vague lump sums, unrealistic timelines
ROI gating — 15% minimum threshold check on all renovation plans
Risk flagging — age-based warnings (galvanized pipe, asbestos, foundation concerns)
Budget vs. actual tracking — Yardi Voyager integration for model calibration
Related MCP server: Property MCP Server
Architecture
MCP tool server callable by Plat's orchestration layer. CLI-first interface.
Plat (agent) ──MCP──▶ plat-costmodel (tool server)
├── estimate — per-unit cost range
├── sow — scope of work generation
├── evaluate — contractor bid evaluation
├── roi — ROI threshold check
└── ingest — Yardi CSV importTwo Scope Levels
Scope | Cost Range | Description |
Light | $3K-$5K/unit | Paint, clean, patch, hardware, carpet |
Standard Value-Add | $12K-$18K/unit | Full kitchen/bath update, LVP, appliances, fixtures |
Gut renos excluded — don't pencil at Class C rents.
Cost Model Inputs
Unit square footage (<700 small, 700-950 medium, 950+ large)
Finish tier (basic vs. upgraded)
Number of bedrooms/bathrooms
Property year built (drives risk flags)
Property class (B or C)
Market (Dallas, Birmingham — more later)
Data Sources
Brain dump knowledge — Day 1 baseline from operator experience
Yardi Voyager CSV exports — historical actuals tagged to unit numbers
RSMeans benchmarks — industry reference data (future)
Cross-user pooled data — anonymous Glassdoor-style model (SaaS future)
v0.1 packaging candidate
The standalone MCP adapter uses MCP 2.3–2.x. Install the [server] extra and run plat-costmodel-mcp (stdio).
CI builds wheel/source archives, tests a fresh wheel environment, and validates runtime/package versions. A release tag must match pyproject.toml, use an unused PyPI version, and pass the full CI workflow before the tested artifacts can be uploaded. Candidate versions are not published by this change.
Available Tools
11 toolscheck_renovation_roiA
Check whether a renovation plan clears the minimum ROI threshold.
Uses the HIGH cost estimate (conservative). Formula: (annual_rent_lift / total_cost_high) * 100. Default threshold is 15%.
Args: total_cost_high: High-end total renovation cost estimate current_monthly_rent: Current monthly rent target_monthly_rent: Expected post-renovation monthly rent threshold_pct: Minimum ROI percentage (default 15%)
Inputs: total_cost_high (required), target_monthly_rent (required), current_monthly_rent (required), threshold_pct.
estimateA
Estimate per-unit renovation cost with line-item breakdown.
Args: unit_sqft: Unit square footage (drives size category: <700 small, 700-950 medium, 950+ large) bedrooms: Number of bedrooms bathrooms: Number of bathrooms (bathroom costs multiply by this) scope_level: "light" ($3K-$5K) or "standard_value_add" ($12K-$18K) finish_tier: "basic" or "upgraded" (granite, backsplash, stainless) year_built: Property year built (triggers risk flags) property_class: "B" or "C" market: "dallas" or "birmingham" unit_id: Optional unit identifier
Inputs: bedrooms (required), bathrooms (required), unit_sqft (required), market, +5 more.
estimate_from_dealC
Project deal + scenarios → per-scenario ScopeRequest(s), estimate each, project back to renovation_program dicts.
Returns {estimates, renovation_programs} index-aligned with
scenarios_list. estimates[i] is a ScopeEstimate dict on success or a
problem dict (error_type-bearing) when the scenario hits the
not_implemented guard. Per-type dispatch lands in slice B PR 3.
Inputs: deal_dict (required), scenarios_list (required).
estimate_full_propertyB
Property-level estimate rolling up unit costs + exterior CapEx.
Args: property_id: Property identifier total_units: Total units at the property units: List of unit dicts with keys: unit_id, sqft, bedrooms, bathrooms, scope_level, finish_tier year_built: Property year built property_class: "B" or "C" market: "dallas" or "birmingham" exterior_items: Exterior CapEx categories to include (default: all). Options: roof, parking, hvac, siding_paint, fencing_gates, landscaping, signage_lighting
Inputs: units (required), property_id (required), total_units (required), market, +3 more.
estimate_property_from_modelA
Property-level estimate using the Property entity model.
Accepts a single property dict containing all property context and unit mix. This is the preferred API for Plat — replaces loose kwargs.
Args: property_data: Dict with keys: - property_id (str, required) - total_units (int, required) - unit_mix (list of dicts with: sqft, bedrooms, bathrooms, scope_level, finish_tier, count) - year_built (int, optional) - property_class ("B" or "C", optional) - market (str, optional) - building_type (str, optional) - exterior_items (list of str, optional)
Inputs: property_data (required).
estimate_scopeC
Canonical entry point: estimate a ScopeRequest, persist (request, estimate).
Returns the ScopeEstimate as a dict, or a ValidationProblem dict on error.
Inputs: scope_request_dict (required).
evaluate_contractor_bidB
Evaluate a contractor bid against the internal cost estimate.
Flags: inflated line items (30%+ above benchmark), vague lump sums, unrealistic timelines.
Args: contractor_name: Name of the contractor bid_line_items: List of dicts with "description" and "amount" keys bid_total: Total bid amount timeline_days: Proposed timeline in days (None if not specified) unit_sqft: Unit square footage for generating comparison estimate bedrooms: Number of bedrooms bathrooms: Number of bathrooms scope_level: "light" or "standard_value_add" finish_tier: "basic" or "upgraded" year_built: Property year built
Inputs: bedrooms (required), bathrooms (required), bid_total (required), unit_sqft (required), +6 more.
generate_scope_of_workB
Generate a detailed scope of work (SOW) for contractor bidding.
Produces a contractor-ready document with material specs, quantities, and quality standards.
Args: unit_sqft: Unit square footage bedrooms: Number of bedrooms bathrooms: Number of bathrooms scope_level: "light" or "standard_value_add" finish_tier: "basic" or "upgraded" property_address: Property street address unit_id: Unit number/identifier
Inputs: bedrooms (required), bathrooms (required), unit_sqft (required), unit_id, +3 more.
get_property_historyB
Return all (scope_request, scope_estimate, actual_outcome) triples for a property as a list of dicts. Empty list if property has no history.
Inputs: property_id (required).
prepare_renovation_program_toolA
Estimate unit cost, validate ROI, and produce underwriting-ready renovation program input.
Runs the full pipeline: estimate → ROI gate → bridge dict matching the multifamily-underwriting deal schema's renovation_program shape.
Returns a dict with:
renovation_program: ready to splice into the deal JSON
roi_result: full ROI gate result for audit trail
ready_to_underwrite: True if ROI gate passed
If the ROI gate fails, returns the result with ready_to_underwrite=False and the roi_result containing path_to_pass guidance.
Args: unit_sqft: Unit square footage (drives size category) bedrooms: Number of bedrooms bathrooms: Number of bathrooms current_monthly_rent: Current monthly rent target_monthly_rent: Expected post-renovation monthly rent start_month: Renovation start month ("YYYY-MM") monthly_pace: Units renovated per month scope_level: "light" or "standard_value_add" finish_tier: "basic" or "upgraded" year_built: Property year built (triggers risk flags) property_class: "B" or "C" market: "dallas" or "birmingham" unit_id: Optional unit identifier downtime_days: Vacancy days per unit during renovation (default 21) threshold_pct: Minimum ROI percentage (default 15%)
Inputs: bedrooms (required), bathrooms (required), unit_sqft (required), start_month (required), +11 more.
register_propertyB
Idempotent property registration.
Accepts a Property-shaped dict (and optional inline floor_plans).
Mints property_id if missing or returns the existing row when
external_alias matches.
Inline floor_plans are deduped by (sqft, bedrooms, bathrooms):
an existing match is reused, otherwise a new FloorPlan is created. This
means calling register_property twice with the same alias and a NEW
floor plan in the payload correctly creates the new floor plan on the
second call (the previous behavior silently dropped it).
Inputs: property_data (required).
Tool Schema Changelog
Recent tool additions, removals, and schema changes observed during successful MCP inspections.
Loading tool schema changelog…
TDQS
Scored across 11 tools
Six tools revolve around estimation (estimate, estimate_scope, estimate_full_property, estimate_property_from_model, estimate_from_deal, prepare_renovation_program_tool), and the property-level pair (estimate_full_property vs estimate_property_from_model) is especially easy to confuse since one is merely the 'preferred' wrapper of the other. Descriptions do clarify levels (per-unit vs property vs deal vs pipeline), so an agent can usually recover, but boundaries are fuzzy.
Nearly all tools follow a clean verb_noun snake_case pattern (check_renovation_roi, estimate_full_property, generate_scope_of_work, evaluate_contractor_bid, register_property, get_property_history). Minor deviations are the bare 'estimate' and the odd '_tool' suffix in prepare_renovation_program_tool, but these are isolated.
11 tools is well within a healthy range for a cost-modeling server covering estimation, ROI, SOW, bid review, registration, and history. The only concern is slight redundancy in the estimation cluster, which nudges it below a perfect score.
The surface covers the core lifecycle: property registration, per-unit and property-level estimation, ROI gating, scope-of-work generation, contractor bid evaluation, deal-scenario projection, and history retrieval. Gaps are minor—no update/delete or list/get property operations, and no standalone exterior-only estimate—but agents can work around these.
Related MCP Connectors
Prospect, grade and analyze off- or on-market real estate deals with deterministic, auditable math.
AI-native operating system for general contractors: estimates, takeoff, bids, pay apps.
Construction takeoff and estimating for AI agents. Measure a drawing PDF, export a priced estimate.
AI-powered job cost estimator for skilled trades with material and labor breakdowns
Related MCP Servers
- AlicenseAqualityDmaintenanceEnables AI agents to prepare floor plans for Ritn3D and interpret 3D outputs by providing tools for validation, complexity estimation, pricing, and failure analysis.9MIT
- AlicenseNot gradedqualityDmaintenanceEnables AI assistants to operate property management systems via natural language, covering repair orders, owner info, payments, notices, and inspections. Features a full agentic workflow with human-in-the-loop and observability.1MIT
- AlicenseNot gradedqualityDmaintenanceProvides AI-powered subsurface scan analysis and plain-English bid drafting tools, helping certified technicians assess hazards and trades build estimates.MIT
- AlicenseNot gradedqualityDmaintenanceEnables AI agents to perform construction takeoff and estimating from drawing PDFs, including upload, scale calibration, trade-based takeoff, pricing, and proposal export.MIT