Skip to main content
Glama

Clip the rest of a video

extend_project

Process more of a video project: continue unprocessed minutes in whole 10-minute parts or add specified time ranges, while keeping existing clips, fixes, and decisions.

Instructions

Process more of a video. Without ranges: the rest of a video only the start of which was processed (get_project partial), as much as the minutes cover, in whole 10-minute parts. With ranges: those parts too (only time no range covers yet is counted). Clips, fixes and decisions stay; new clips come only from the new part. Refused with the upgrade offer when the minutes do not cover it. Returns { fromSec, untilSec, durationSec, whole, ranges? }; then wait_for_project.

Tool call template

Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {
      "id": "<id>"
    },
    "name": "extend_project"
  }
}

Input Schema

NameRequiredDescriptionDefault
idYesProject id (from list_projects, search_clips or create_project)
rangesNoMore parts to clip, as create_project takes them: [{ startSec, endSec, mode?, label?, ref? }]

Schema Changelog

Changes observed during successful MCP inspections.

  1. Addedv0.51.1

TDQS

A4.4/5.0
Behavior5/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

Annotations only declare destructiveHint=false, so the description carries the real burden and does: existing clips, fixes and decisions are preserved, new clips come only from the newly processed part, work is done in whole 10-minute parts, and requests beyond the plan's minutes are refused with an upgrade offer. That is exactly the kind of state-impact and entitlement behavior an agent cannot get from the annotation.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness4/5

Is the description appropriately sized, front-loaded, and free of redundancy?

It is short, front-loaded with the core action, and structured as without-ranges / with-ranges / side-effects / failure / return / next-step. The telegraphic fragments ("those parts too (only time no range covers yet is counted)") cost some readability, but no sentence is filler.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness4/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

There is no output schema, and the description compensates by naming the returned fields (fromSec, untilSec, durationSec, whole, ranges) plus the natural next call, which is strong for a 2-parameter tool. The only remaining gap is that the return semantics of the individual fields are not explained, and the interaction between provided ranges and the 'whole 10-minute parts' rule is left partly implicit.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters4/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema coverage is 100%, so the baseline is 3, but the description adds genuine semantic meaning beyond the schema by defining what omitting ranges does (process the rest, in whole 10-minute strides) and how provided ranges interact with already-covered time. It also enumerates the return fields, though it does not elaborate on how range ordering or overlap is resolved beyond the 'only uncovered time counts' rule.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose4/5

Does the description clearly state what the tool does and how it differs from similar tools?

The description states a specific verb and resource ("Process more of a video") and pins down the exact scenario: extending a project whose start was already processed via get_project partial. It is clearly distinguishable from siblings like get_project or create_project, though the phrasing is dense enough that the core action is inferred from the title as much as the first sentence.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines5/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

It explicitly branches on the two input modes: without ranges it processes the remainder not yet covered, with ranges it processes those parts with only uncovered time counted. It also names the follow-up tool ("then wait_for_project") and the failure path (refused with an upgrade offer when minutes do not cover the request), leaving no inference needed about when and how to call it.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.

Deploy Server

Other Tools