p6_project_summary
Retrieve a full Primavera P6 project snapshot in one call: dates, activity status, relationships, critical counts, completion metrics, baseline variance, and schedule state.
Instructions
One-call overview of a project (values of the last F9): project (name, calendar), dates (data date, planned start, must finish by, scheduled finish, last schedule run, first start and last finish of the activities, scheduled finish minus must finish by in calendar days), activities (by status, by type, open, open milestones), relationships (successor in the project; from and to other projects), critical (counts of open activities, LOE and WBS summary left out, as p6_critical_path), percent_complete (primary = units: actual / at completion units, labor plus nonlabor, P6 Units % Complete as p6_list_wbs; p6_progress_curve gives % of the budget instead; physical: physical % weighted by budget units; duration; activities completed; units_vs_physical_mismatch: activities with units whose physical % and units % differ by more than 0.01 point), baseline (the project baseline, baselines attached, the one used: baseline= else the project baseline; finish variance in calendar days, baseline planned units % at the data date and spi_units = earned units / baseline planned units, earned value and linear spread as p6_progress_curve), counts (WBS, assignments, resources, calendars, code assignments) and schedule_state.
Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| project | Yes | Project ID as shown in P6 (p6_list_projects). | |
| baseline | No |