p6_float_analysis
Analyze total and free float distribution for open Primavera P6 activities by day buckets, with counts, percentages, samples, and summary statistics.
Instructions
Total and free float distribution of the open activities (not completed, LOE and WBS summary left out) of the last F9, in days of each activity's calendar. Buckets from edges_days (default -20, -10, -5, 0, 5, 10, 20, 44; 0 is always added): below the first edge, [a, b) below zero, exactly 0, (a, b] above zero, above the last edge, so every value falls in exactly one bucket (compared in hours, never rounded). Each bucket: total_float and free_float counts, their % of the activities, and samples (the sample_size lowest floats). no_value counts activities without a float; all_ranges_covered checks that bucket counts plus no_value equal the activities. stats: min, max, mean and median in days, total floats that are not whole days, negative, zero, critical (project definition). include_milestones=False leaves milestones out; wbs_name_contains and code_type / code_value / include_child_codes filter as in p6_query_activities (code_filter in the result, as there).
Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| project | Yes | Project ID as shown in P6 (p6_list_projects). | |
| code_type | No | ||
| code_value | No | ||
| edges_days | No | ||
| sample_size | No | Sample rows per check (max 50). | |
| wbs_name_contains | No | ||
| include_milestones | No | ||
| include_child_codes | No |