get_phase_instructions
Retrieve detailed instructions for any Previs Director pipeline phase (1–8), including the gate criteria required before advancing to the next phase.
Instructions
Get detailed instructions for a specific phase (1–8) of the Previs Director pipeline, including the gate criteria that must be met before advancing.
Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| phase_number | Yes |
Output Schema
| Name | Required | Description | Default |
|---|---|---|---|
| result | Yes |