Skip to main content
Glama

delete_schedule_task

Destructive

Deletes a specific task from a Pterodactyl server schedule using server, schedule, and task IDs to remove unwanted scheduled actions.

Instructions

Delete a specific task from a schedule.

Tool call template

Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {
      "server_id": "<server_id>",
      "schedule_id": "<schedule_id>",
      "task_id": "<task_id>"
    },
    "name": "delete_schedule_task"
  }
}

Input Schema

NameRequiredDescriptionDefault
task_idYesNumeric task ID
server_idYesShort server identifier
schedule_idYesNumeric schedule ID

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observedv1.0.1

TDQS

C2.9/5.0
Behavior2/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

Annotations already declare readOnlyHint=false and destructiveHint=true, so the safety profile is covered structurally. The description adds nothing beyond that: it does not say whether deletion is permanent, what happens to the remaining tasks or their ordering, or whether the schedule must be stopped first. For an irreversible mutation, that is a real gap.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness4/5

Is the description appropriately sized, front-loaded, and free of redundancy?

A single front-loaded sentence with zero filler, and the scope qualifier ('from a schedule') arrives immediately. It is efficient, though brevity here shades into under-specification rather than elegance.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness2/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

The tool is a destructive mutation with no output schema, yet the description provides no warning about irreversibility, no confirmation that the parent schedule survives, and no indication of what the response contains. With full schema coverage the parameter side is fine, but the behavioral side is thin for a deletion operation.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters3/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

All three parameters (server_id, schedule_id, task_id) are fully described in the schema, including type and range constraints, so the schema does the heavy lifting. The description adds no meaning about how the IDs relate (e.g., that task_id must belong to schedule_id on server_id), which would have been the useful contribution.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose4/5

Does the description clearly state what the tool does and how it differs from similar tools?

States a specific verb and resource ('Delete a specific task') and scopes it to a single task within a schedule, which implicitly separates it from delete_schedule and delete_allocation. It stops short of naming any sibling explicitly, so the differentiator is inferred from wording rather than stated.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines2/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

There is no when-to-use guidance, no mention of prerequisites such as the schedule existing or the task being idle, and no named alternative (e.g., delete_schedule for removing everything). The only hint is the phrase 'from a schedule', which weakly implies removing one task rather than the whole schedule.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.