theotown_validate_plan
Validates a batch of construction commands by running dry-run bounds checks and estimating costs before execution.
Instructions
Perform dry-run bounds checks and cost estimations for a batch of construction commands.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"commands": "<commands>"
},
"name": "theotown_validate_plan"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| dry_run | No | ||
| commands | Yes |
Output Schema
| Name | Required | Description | Default |
|---|---|---|---|
| valid | Yes | ||
| errors | No | ||
| warnings | No | ||
| command_count | No | ||
| affected_tiles | No | ||
| estimated_cost | No |