tempo_get_plans
Retrieve Tempo resource allocation plans within a date range, with optional filters for projects, issues, accounts, and plan IDs.
Instructions
Retrieve a list of Tempo plans (resource allocations) matching the given parameters. Requires from and to dates.
Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| to | Yes | End date (YYYY-MM-DD) — required | |
| from | Yes | Start date (YYYY-MM-DD) — required | |
| view | No | Response shape: "compact" (default) drops fields the response already carries elsewhere; "full" returns every field this server understands. compact strips image/avatar URLs from the response; "full" returns Tempo's payload untouched. No field projection: this server has no verified record of which Tempo fields matter, and inventing one would risk dropping a field a caller needs. | |
| limit | No | Max results (max 5000) | |
| offset | No | Pagination offset | |
| planIds | No | Filter by specific plan ids | |
| issueIds | No | Filter by Jira issue ids | |
| accountIds | No | Filter by user account ids | |
| projectIds | No | Filter by Jira project ids | |
| planItemIds | No | Filter by plan item ids (issue or project ids) | |
| updatedFrom | No | Filter by update date | |
| assigneeTypes | No | Filter by assignee type | |
| planItemTypes | No | Filter by plan item type | |
| genericResourceIds | No | Filter by generic resource ids | |
| plannedTimeBreakdown | No | Time breakdown granularity |