e3d_nozzle_orientation_drawing
Reads explicit E3D nozzle references and native PPOS/PDIR connection points in WORLD coordinates to generate bounded TOP/FRONT orientation drawings, with optional SVG/DXF exports and paged A3/A4 sheets.
Instructions
Read explicitly supplied E3D nozzle references and native PPOS/PDIR connection-point data in WORLD coordinates, then build a bounded TOP plan and FRONT elevation orientation drawing. The structured receipt preserves every native response, point availability, position and direction, plus computed horizontal bearing and tilt when PDIR is finite. A PNG preview is always returned for complete geometry; include_svg and include_dxf optionally add vector exports with PDIR arrowheads drawn as feature lines rather than equipment outlines. Optional sheet creates paged A3/A4 landscape sheets with matching point IDs, leader labels and a WORLD coordinate/bearing/tilt schedule; each page uses one model-to-paper scale for both views. Sheets admit up to 128 points, with a total preview budget of 8000000 pixels. Incomplete or unavailable native geometry returns evidence without a partial image or vector drawing. It never infers DN, connection compatibility, catalogue data or engineering validity, and it never traverses the model automatically. The tool does not modify the model, CE, Drawlist, camera or view.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"targets": "<targets>"
},
"name": "e3d_nozzle_orientation_drawing"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| sheet | No | Optional printable point-orientation sheets; omitting this preserves the existing bare-view output. | |
| targets | Yes | ||
| include_dxf | No | Include ASCII DXF R2000 vector output for complete native point data; dimension annotations are omitted because the drawing is a nozzle-point layout, not an equipment envelope. | |
| include_svg | No | Include TOP/FRONT vector SVG in the structured drawing. | |
| preview_width | No | ||
| preview_height | No |