Multi-scene film status
axcel_sequence_statusCheck progress of a multi-scene film, then resume a paused or stopped generation from its last completed scene, with confirm required to retry failed scenes.
Instructions
Progress of a multi-scene film. resume=true continues a paused or stopped film where it left off (finished scenes are never resubmitted; re-running a FAILED scene needs confirm=true).
Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| resume | No | ||
| confirm | No | Needed with resume=true when a scene failed and must be generated again. | |
| pipelineId | Yes |